\documentclass[12pt,a4paper,notitlepage]{report} \usepackage[utf8]{inputenc} \usepackage[a4paper,textwidth=17cm, top=2cm, bottom=3.5cm]{geometry} \usepackage[T1]{fontenc} \usepackage[ backend=biber, style=numeric, natbib=true, url=false, doi=true, eprint=false ]{biblatex} \addbibresource{safety_reset.bib} \usepackage{amssymb,amsmath} \usepackage{listings} \usepackage{eurosym} \usepackage{wasysym} \usepackage{amsthm} \usepackage{tabularx} \usepackage{multirow} \usepackage{multicol} \usepackage{tikz} \usepackage{mathtools} \DeclarePairedDelimiter{\ceil}{\lceil}{\rceil} \DeclarePairedDelimiter{\paren}{(}{)} \usetikzlibrary{arrows} \usetikzlibrary{chains} \usetikzlibrary{backgrounds} \usetikzlibrary{calc} \usetikzlibrary{decorations.markings} \usetikzlibrary{decorations.pathreplacing} \usetikzlibrary{fit} \usetikzlibrary{patterns} \usetikzlibrary{positioning} \usetikzlibrary{shapes} \usepackage[binary-units]{siunitx} \DeclareSIUnit{\baud}{Bd} \usepackage{hyperref} \usepackage{tabularx} \usepackage{commath} \usepackage{graphicx,color} \usepackage{subcaption} \usepackage{float} \usepackage{footmisc} \usepackage{array} \usepackage[underline=false]{pgf-umlsd} \usetikzlibrary{calc} %\usepackage[pdftex]{graphicx,color} \usepackage{epstopdf} \usepackage{pdfpages} \usepackage{minted} % pygmentized source code % Needed for murks.tex \usepackage{setspace} \usepackage[draft=false,babel,tracking=true,kerning=true,spacing=true]{microtype} % optischer Randausgleich etc. % For german quotation marks \newcommand{\degree}{\ensuremath{^\circ}} \newcolumntype{P}[1]{>{\centering\arraybackslash}p{#1}} \usepackage{fancyhdr} \fancyhf{} \fancyfoot[C]{\thepage} \newcommand{\includenotebook}[2]{ \fancyhead[C]{Included Jupyter notebook: #1} \includepdf[pages=1, pagecommand={\thispagestyle{fancy}\section{#1}\label{#2_notebook}} ]{resources/#2.pdf} \includepdf[pages=2-, pagecommand={\thispagestyle{fancy}} ]{resources/#2.pdf} } \begin{document} % Beispielhafte Nutzung der Vorlage für die Titelseite (bitte anpassen): \input{murks} \titelen{A Post-Attack Recovery Architecture for Smart Electricity Meters} \titelde{Eine Architektur zur Kontrollwiederherstellung nach Angriffen auf Smart Metering in Stromnetzen} \typ{Masterarbeit} \grad{Master of Science (M. Sc.)} \autor{Jan Sebastian Götte} \gebdatum{Aus Datenschutzgründen nicht abgedruckt} % Geburtsdatum des Autors \gebort{Aus Datenschutzgründen nicht abgedruckt} % Geburtsort des Autors \gutachter{Prof. Dr. Björn Scheuermann}{Prof. Dr.-Ing. Eckhard Grass} \mitverteidigung % entfernen, falls keine Verteidigung erfolgt %FIXME \makeTitel \selbstaendigkeitserklaerung{31.03.2020} \newpage % Hier folgt die eigentliche Arbeit (bei doppelseitigem Druck auf einem neuen Blatt): \tableofcontents \newpage \chapter{Introduction} Like in all fields of engineering there is an ongoing diffusion of information systems into industrial control systems in the power grid. Automation of these control systems has been practised for the better part of a century already. Until recently this automation was mostly limited to core components of the grid. Generators in power stations are computer-controlled according to electromechanical and economic models. Switching in substations is automated to allow for fast failure recovery. Humans are still vital to these systems, but their tasks have shifted from pure operation to engineering, maintenance and surveillance. A large-scale trend in power systems is the move from a model of centralized generation built around massive large-scale fossil and nuclear power plants towards a more heterogenous model. In this new model large-scale fossil power plants still serve a major role but two new factors come into play. One is the advance of renewable energies. The large-scale use of wind and solar power in particular from a current standpoint seems unavoidable for our continued existence on this planet. For the electrical grid however, these systems constitute a significant challenge. Fossil-fueled power plants can be precisely controlled to match the expected energy consumption at any point in time. This tracking of production and consumption is vital to the stability of the grid. Renewable energies such as wind and solar power do not provide the same degree of controllability, and they introduce a large degree of uncertainty due to the unpredictable way of the forces of nature. Along with this change in dynamic behavior renewable energies have brought forth the advance of distributed generation. In distributed generation end-customers that previously only consumed energy have started to feed energy into the grid from small solar installations on their property. Distributed generation is a chance for customers to gain autonomy and shift from a purely passive role to being active participants of the electricity market\cite{crastan03}. To match this new landscape of decentralized generation and unpredictable renewable resources the utility industry has had to adapt itself in major ways. One aspect of this adaption that is particularly visible to ordinary people is the computerization of end-user energy metering. Despite the widespread use of industrial control systems inside the electrical grid and the far-reaching diffusion of computers into people's everyday lifes the energy meter has long been one of the last remnants of an offline, analog time. Until the 2010s many of the world's households were still served through electromechanical Ferraris-style meters that have their origin in the late 19th century. % FIXME citation. Today under the umbrella term \emph{Smart Grid} the shift towards fully computerized, often networked meters has been partially accomplished. The roll out of these \emph{Smart Meters} has not been very smooth overall with some countries severely lagging behind other countries. As a safety-critical technology smart meter technology is usually standardized on a per-country basis. This leads to an inhomogenous landscape with in some instances wildly incompatible systems. Often vendors only serve a single country or have a separate model of their meter for each country. This complex standardization landscape and market situation has led to a proliferation of highly complex, custom-coded microcontroller firwmare. The complexity and scale of this often network-connected firmware makes for a ripe substrate for bugs to surface. A remotely exploitable flaw inside a smart meter's firmware\footnote{ There are several smart metering architectures that ascribe different roles to the component called \emph{smart meter}. Coarsely divided into two camps these are systems where all metering and communication code resides within one physical unit and systems where metering and communication are separated into two units, the \emph{smart meter} and the \emph{smart meter gateway}. An example for the former are setups in the USA, an example of the latter is the one in Germany. For clarity in this introductory chapter we use \emph{smart meter} to describe the entire system at the customer premises including both the meter and a potential gateway. } could have consequences ranging from impaired billing functionality to an existential threat to grid stability. A coördinated attack on meters in a country where load switches are common could at worst cause widespread activation of grid safety systems by repeatedly connecting and disconnecting megawatts of load capacity in just the wrong moments. Mitigation of these attacks through firmware security measures is unlikely to yield satisfactory results. The enormous complexity of smart meter firmware makes firmware security extremely labor-intensive. The diverse standardization landscape makes a coördinated, comprehensive response unlikely. In this thesis instead of lamenting the state of firmware security we introduce a pragmatic solution to the in our minds likely scenario of a large-scale compromise of smart meter firmware. In our proposal the components of the smart meter that are threatened by remote compromise are equipped with a physically separate \emph{safety reset controller} that listens for a reset command transmitted through the electrical grid itself and on reception forcibly resets the smart meter's entire firmware to a known-good state. Our safety reset controller receives commands through Direct Sequence Spread Spectrum (DSSS) modulation carried out on grid frequency through a large controllable load such as an aluminium smelter. After forward error correction and cryptographic verification it re-flashes the target application microcontroller over the standard JTAG interface. In this thesis starting from a high-level architecture we have carried out extensive simulations of our proposal's performance under real-world conditions. Based on these simulations we implemented an end-to-end prototype of our proposed safety reset controller as part of a realistic smart meter demonstrator. Finally we experimentally validate our results and give an outline of further steps towards practical implementation. \chapter{Fundamentals} \section{Structure and operation of the electrical grid} Since this thesis is filed under \emph{computer science} we will provide a very brief overview of some basic aspects of modern power grids. \subsection{Structure of the electrical grid} The electical grid is composed of a large number of systems such as distribution systems, power stations and substations interconnected by long transmission lines. Mostly due to ohmic losses\footnote{ Power dissipation of a resistor of resistance $R [\Omega]$ given current $I [A]$ is $P_\text{loss} [W] = U_\text{drop} \cdot I = I^2 \cdot R$. Fixing power $P_\text{transmitted} [W] = U_\text{line} \cdot I$ this yields a dependency on line voltage $U_\text{line} [V]$ of $P_\text{loss} = \left(\frac{P_\text{transmitted}}{U_\text{line}}\right)^2 \cdot R$. Thus, ignoring other losses a $2\times$ increase in transmission voltage halves current and cuts ohmic losses to a quarter. In practice the economics of this are much more complicated due to the cost of better isolation for higher-voltage parts and the added factor of power factor compensation. } the efficiency of transmission of electricity through long transmission lines increases with the square of voltage\cite{crastan01,simon01}. % simon01: p. 425, 9.4.1.1, crastan p.55, 3.1 In practice economic considerations take into account a reduction of the considerable transmission losses (about \SI{6}{\percent} in case of Germany\cite{destatis01}) as well as the cost of equipment such as additional transformers and the cost increase for the increased volatage rating of components such as transmission lines. Overall these considerations have led to a hierarchical structure where large amounts of energy are transmitted over very long distances (up to thousands of kilometers) at very high voltages (upwards of \SI{200}{\kilo\volt}) and voltages get lower the closer one gets to end-customer premises. In Germany at the local level a substation will distribute \SIrange{10}{30}{\kilo\volt} to large industrial consumers and streets with small transformer substations converting this to the \SI{400}{\volt} three-phase AC households are usually hooked up with\cite{crastan01}. \subsubsection{Transmission lines, bus bars and tie lines} The number one component of the electrical grid are transmission lines. Short transmission lines that tightly couple parts of a substation are called \emph{bus bars}. Transmission lines that couple otherwise independent grid segments are called \emph{tie lines}. A tie line often connects grid segments operated by two different operators e.g.\ across a country border. \emph{Short} transmission lines can be approximated as a simple lumped-component RLC\footnote{resistor-inductor-capacitor} circuit. In this case the effect of wave propagation along the line does not have to be taken into consideration. In this lumped model the transmission line is represented by a circuit of one or two inductors, one or two capacitors and some resistors. This representation simplifies analysis. For \emph{long} transmission lines above \SI{50}{\kilo\meter} (cable) or \SI{250}{\kilo\meter} (overhead lines) this approximation breaks down and wave propagation along the line's length has to be taken into account. The resulting model is what RF engineering calls a \emph{transmission line} and models the line's parasitics\footnote{stray capacitance, ohmic resistance and stray inductance} as being uniformly distributed along the length of the line. To approximate this model in lumped-element evaluations the line is represented as a long chain of small lumped-component RLC sections. This complex structure makes modelling more difficult in comparison to short lines\cite{crastan01}. Almost all transmission lines used in the transmission and distribution grid use three-phase AC. Long-distance overland lines are usually implemented as overhead lines due to their low cost and ease of maintenance. Underground cables are much more expensive due to their isolation and are only used when overhead lines cannot be used for e.g.\ safety or aesthetic reasons. In some specialized applications such as long, high-power undersea cables high-voltage DC (HVDC) is used. In HVDC converter stations at both ends of the line convert between three-phase AC and the line's DC voltage. These converter stations are controlled electronically and do not exhibit any of the electromechanical effects generators in a power plant do. Since HVDC re-synthesizes three-phase AC from DC at the receiving end of the line it can be used to couple non-synchronous grids. This also allows for additional degrees of control over the transmission of power compared to a regular transmission line. These technical benefits are offset by the high initial cost (mostly due to the converter stations) leading to HVDC being used in specific situations only\cite{crastan03}. \subsubsection{Generators} Traditionally all generators in the power grid were synchronous machines. A synchronous machine is a generator that is wound and connected in such a way that during normal operation its rotation is synchonous with the grid frequency. Grid frequency and generator rotation speed are bidirectionally electromechanically coupled. If a generator would lag behind the grid it would receive electrical energy from the grid and convert it into mechanical energy, acting as a motor. Small deviations between rotational speed and grid frequency will be absorbed by the electromechanical coupling between both. All generators connected to the grid operate synchronously. Maintaining this synchronization over time is the task of complex control systems within each power station\cite{simon01,crastan01}. Nowadays besides traditional rotating generators the grid also contains a large amount of electronically controlled inverters. These inverters are used in photovoltaic installations and other setups where either DC or non-synchronous AC is to be fed into the grid. Setups like this behave differently to rotating generators. In particular \emph{inertia} in these setups is either absent or a software parameter potentially reducing their overload capacity compared to rotating generators. The fundamentally different nature of electronically controlled inverters has to be taken into account in planning and regulation\cite{crastan03}. \subsubsection{Switchgear} In the electrical grid switches perform various roles. The ones a computer scientist would recognize are used for routing electricity between transmission lines and transformers and can be classified into ones that can be switched under load (called load switches) and ones that can not (called disconnectors). The latter are used to ensure parts of the network are free from voltage. The former are used to re-route flows of electrical currents. A major difference in their construction is that in contrast to disconnectors load switches have built-in components that extinguish the high-power arc discharge that forms when the circuit is interrupted under load\footnote{ While an arc discharge is considered a fault condition in most low-voltage systems including computers, in energy systems it is often part of normal operation. }. Beyond this there are circuit breakers. Circuit breakers are safety devices that can still switch even under failure conditions at several times the circuit's nominal current. They are activated automatically on conditions such as overcurrent or overvoltage. Fuses can be considered non-resettable switches. The fuse in a computer power supply is barely more than a glass tube with some wire in it that is designed to melt at the designated current. In energy systems fuses are often much more complex devices that in some cases even utilize explosivese to quickly and decisively open the circuit and extinguish the resulting arc discharge\cite{nelles01,crastan01,simon01}. % disconnect switches, fuses, breakers -> crastan 1 (ch. 8) \subsubsection{Transformers} Along with transmission lines transformers are one of the main components most people will be thinking of when talking about the electrical grid. Transformers connect grid segments at different voltage levels with one another. In the distribution grid transformers are used to provide standard end-user voltage levels to the customer (e.g. 230/400V in Europe) from a \SIrange{10}{25}{\kilo\volt} feeder. Transformers can also be used to convert between buses without a fourth neutral conductor and buses with one. Transformers are large and heavy devices consisting of thick copper wire or copper foil windings arranged around a core made from thin stacked, insulated iron sheets. The entire core sits within a large metal enclosure that is filled with liquid (usually a specialized oil) for both cooling and electrical insulation. This cooling liquid is cooled by means such as radiator fins on the transformer enclosure itself or an external radiator. Depending on the design cooling may rely on natural convection within the cooling liquid or on electrical pumps\cite{crastan01,simon01}. Transformers come in a large variety of coil and wiring configurations. There exist autotransformers where the secondary is part of the primary (or vice-versa) that are used to translate between voltage levels without galvanic isolation at lower cost. Transformers used in parts of the electrical grid often have several taps and include \emph{tap changers}. A tap changer is a system of mechanical switches that can be used to switch between several discrete transformer ratios to adjust secondary voltage under load\cite{simon01}. Tap changers are used in the distribution grid to maintain the specified voltage tolerances at the customer's connection. \subsubsection{Instrument transformers} While operating on the exact same physical principles instrument transformers are very different from regular transformers in an energy system. Instrument transformers are specialized low-power transformers that are used as transducers to measure voltage or current at very high voltages. They are part of the control and protection systems of substations\cite{crastan01}. \subsubsection{Chokes} Chokes are large inductors. In power grid applications their construction is similar to the construction of a transformer with the exception that they only have a single winding on the core. They are used for a variety of purposes. A frequent use is as a series inductor on one of the phases or the neutral connection to limit transient fault currents. In addition to use as simple series inductances for current limiting inductors are also used to tune LC circuits. One such use are Petersen coils, large inductors in series with the earth connection at a transformer's star point are used to quickly extinguish arcs between phase and ground on a transmission line. The Petersen coil forms a parrallel LC resonant circuit with the transmission line's earth capacitance. Tuning this circuit through adjusting the petersen coil reduces earth fault current to levels low enough to quickly extinguish the arc\cite{simon01}. \subsubsection{Power factor correction} Reactive power (also referred to as \emph{VAR} after its is unit Volt-Ampère Reactive) an important variable in the operation of electrical grids (see sec.\ \ref{frequency_estimation}). If reactive power generation and consumption are mismatched, high currents develop that lead to high transmission losses. For this reason grids include circuits to compensate reactive power imbalances\cite{crastan01}. These circuits can be as simple as inductors or capacitors connected to a power line but often can be switched to adapt to changing load conditions. Static Var compensators are particularly fast-acting reactive power compensation devices whose purpose is to maintain bus voltage\cite{rogers01}. \subsubsection{Loads} Lastly, there is the loads that the electrical grid serves. Loads range from mains-powered indicator lights in devices such as light switches or power strips weighing in at mere milliwatts to large smelters in industrial metal production that can consume a good fraction of a gigawatt all on their own. \subsection{Operational concerns} \subsubsection{Modelling the electrical grid} Modelling performs an important role in the engineering of a reliable power infrastructure. The grid is a complex, highly dynamic system. To maintain operational parameters such as voltage in various parts of the grid, grid frequency and currents inside their specified ranges complex control systems are necessary. To design and parametrize such control systems simulations are a valuable tool. Using model calculations the effects of control systems on operational variables such as transmission efficiency or generation losses can be estimated. Model simulations can be used to identify structural issues such as potential points of congestion. The same models can then be used to engineer solutions to such issues, e.g.\ by simulating the effect of a new transmission line. There are several aspects under which the grid or parts of the grid can be simulated. There are static analysis methods such as modal analysis that yield information on electromechanical oscillations by computing the eigenvalues of a large system of differential equations describing the collective behavior of all components of the grid. Modal analysis is one example of simulations used in grid planning. Using modal analysis likely oscillatory modes can be identified and ultimately these results can inform a decision to install additional stabilization systems in a particular location. In contrast to static analysis, transient simulations calculate an approximation of the time-domain behavior of some variable of interest under a given model. Transient simulations are used e.g.\ in the design of control systems. Power flow equations describe the flow of electrical energy throughout the network from generator to load. Numerical solutions these equations are used to optimize control parameters to increase overall efficiency. % TODO decide what of this to keep. % \subsubsection{Generator controls} % \subsubsection{Load shedding} % \subsubsection{System stability} % \subsubsection{Power System Stabilizers} \section{Smart meter technology} Smart meters were a concept pushed by utility companies throughout the 00's. Smart metering is one component of the larger societal shift towards digitally interconnected technology. Old analog meters required that service pesonnel physically come to read the meter. \emph{Smart} meters automatically transmit their readings through modern technologies. Utility companies were very interested in this move not only because of the cost savings for meter reading personnel. Beyond this, an always-connected meter allows several entirely new use cases that have not been possible before. One often-cited one is utilizing the new high-resolution load data to improve load forecasting to allow for greater generation efficiency. Computerizing the meter also allows for new fee models where electricity cost is no longer fixed over time but adapts to market conditions. Models such as prepayment electricity plans where the customer is automatically disconnected until they pay their bill are significantly aided by a fully electronic system that can be controlled and monitored remotely. A remotely controllable load switch can also be used to coerce customers in situations where that was not previously economically possible\footnote{ The swiss association of electrical utility companies in sec.\ 7.2 par.\ (2)a of their 2010 whitepaper on the introduction of smart metering\cite{vseaes01} cynically writes that remotely controllable load switches ``lead a new tenant to swiftly register'' with the utility company. This whitepaper completely vanished from their website some time after publication, but the internet archive has a copy. }. Figure \ref{fig_smgw_schema} shows a schema of the smart metering installation in a typical household. \begin{figure} \centering \includegraphics{resources/smgw_usage_scenario} \caption{A typical usage scenario of a smart metering system in a typical home.} \label{fig_smgw_schema} \end{figure} To the customer the utility of a smart meter is largely limited to the convenience of being able to read it without going to the basement. In the long term it is said that there will be second-order savings to the customer since electricity prices adapting to the market situation along with this convenience will lead them to consume less electricity and to consume it in a way that is more amenable to utilities, both leading to reduced cost. % FIXME citation Traditional Ferraris counters with their distinctive rotating aluminium disc are simple electromechanical devices. Since it does not include any failure-prone semiconductors or other high technology a cheap Ferraris-style meter can easily last decades. In contrast to this, smart meters are complex high technology. They are vastly more expensive to develop in the first place since they require the development and integration of large amounts of complex, custom firwmare. Once deployed, their lifetime is severely limited by this very complexity. Complex semiconductor devices tend to fail, and firmware that needs to communicate with the outside world tends to not age well. % FIXME citation This combination of higher unit cost and lower expected lifetime leads to grossly increased costs per household. This cost is usually shared between utility and customer. % FIXME citation As part of its smart metering rollout the German government in 2013 had a study conducted on the economies of smart meter installations. This study came to the conclusion that for the majority of households computerizing an existing ferraris meter is uneconomical. For larger consumers or new installations the higher cost of installation over time is offset by the resulting savings in electricity cost\cite{bmwi03}. \subsection{Human-Computer Interaction aspects of smart meter technology} A fundamental aspect in realizing the cost and energy savings promised by the smart metering revolution is that it requires a paradigm shift in consumer interaction. Previously most consumers would only confront their energy use when their monthly or yearly electricity bill arrived. All of the cost savings smart meters promise over traditional metering infrastructure\footnote{ We are excluding savings from Demand-Side Response (DSR) implemented through smart meters here: Traditional ripple control systems already allowed for these, and due to the added cost of high-power relays many smart meters do not include such features. } critically depend on the consumer regularly interacting with the meter through an in-home display or app. We live in an era where our attention is already highly contested. A myriad of apps and platforms compete for our attention through our smart phones and other devices. Introducing an entirely new service into this already complex battleground is a large endeavour. On the one hand it is not clear how this new service would compete with everything else. On the other hand if it does manage to capture our attention and lead us to modify our behavior, what are the side effects? For instance, does an in-home display increase financial anxiety in economically disadvantaged customers? Human Computer Interaction research has touched the topic of smart metering several times and has many insights to offer for technologists\cite{pierce01,rodden01,lupton01,costanza01,fell01}. An issue pointed out in \textcite{rodden01} is that at least in some countries consumers fundamentally distrust their utility companies. This trust issue is exacerbated by smart meters being unilaterally forced onto consumers by utility companies. Much of the success of smart metering's ubiquitous promises of energy savings fundamentally depends on consumer coöperation. Here, the aforementioned trust issue calls into question smart metering's chances of long-term success. As \text{pierce01} pointed out smart metering developments could benefit greatly from early involvement of HCI research. HCI research certainly would not have overlooked entire central issues such as privacy as it happened in the dutch case\cite{cuijpers01}. The current corporate-driven approach to a technological advance forced through national standardization bears a serious risk of failing to meet its ostensible objectives for consumers. The role of consumers and the complex sociotechnological environment posed by this new technology is seriously considered nowhere in the standardization process. While certainly noone will admit to outright ignoring consumers in smart meter standardization their role is largely limited to the occassional public consultation. At the same time the standards are written by technologists--it seems largely without input on their practicality or socio-technological implications from fields such as HCI. % TODO citation? too much burn? \subsection{Common components} \label{sm-cpu} Smart meters usually are built around an off-the-shelf microcontroller. Some meters use specialized smart metering SOCs\cite{ifixit01} while others use standard microcontrollers with core metering functions implemented in external circuitry (cf.\ sec.\ \ref{sec-easymeter} where we detail the meter in our demonstration setup). Specialized SoCs usually contain a segment LCD driver along with some high-resolution analog-to-digital converters for the actual measurement functions. In many smart meter designs used outside of Germany the metering SoC will be connected to another full-featured SoC acting as the modem. At a casual glance this might seem to be a security measure, but it may be more likely that this is done to ease integration of one metering platform with several different communication stacks (e.g.\ proprietary sub-gigahertz wireless, powerline communication (PLC) or ethernet). In these architectures there is a clear line of functional demarcation between the metering SoC and the modem. As evidenced by over-the-air software update functionality (see e.g.\ \textcite{honeywell01}) this does not however extend to an actual security boundary. Energy usage is calculated by measuring both voltage and current at high resolution and then integrating the measurements. Current measurements are usually made with either a current transformer or a shunt in a four-wire configuration. Voltage is measured by dividing input AC down with a resistor chain. Both are integrated digitally using the MCU's time base as a reference. Whereas legacy electromechanical energy meters only provided a display of aggregate energy use through a decimal counter as well as an indirect indication of power through a rotating wheel one of the selling points of smart meters is their ability to calculate advanced statistics on energy use. These statistics are supposed to help customers better target energy conservation measures though evidence of this happening is scarce. % FIXME strong citation here plz! In addition to the pure measurement and data aggregation functions in many deployments % FIXME citation. EU white paper? smart meters perform two additional functions. One is to serve as a gateway between the utility company's control systems and large controllable loads in the consumer's household for Demand-Side Management (DSM). % FIXME citation In DSM the utility company can control when exactly a high-power device such as a water storage heater is turned on. To the customer the precise timing does not matter since the storage heater is set so that it has enough hot water in its reservoir at all times. The utility company however can use this degree of control to reduce load variations during temporary imbalances such as peaks. The efficiency gains realized with this system translate into lower electricity prices for DSM-enabled loads for the customer. Traditionally DSM was realized on a local level using ripple control systems. In ripple control control data is coded by modulating a carrier at a low frequency such as \SI{400}{\hertz} on top of the regular mains voltage. These systems require high-power transmitters at tens of kilowatts and still can only bridge regional distances\cite{dzung01}. Another important additional function is that in some countries some smart meters can be used to remotely disconnect consumer households with outstanding bills. Using euphemisms such as \emph{utility revenue protection}\cite{kamstrup01} or \emph{reducing nontechnical losses}\cite{brown01} while cynically claiming \emph{Consumer Empowerment}\cite{kamstrup01} these systems allow an utility company to remotely disconnect a customer at any time. Whereas before smart metering this required either additional hardware or an expensive site visit by a qualified technician smart meters have ushered in an era of frictionless control\footnote{ Note that in some countries such as the UK non-networked mechanical prepayment meters did exist. In such systems the user inserts coins into a coin slot that activates a load switch at the household's main electricity connection. These systems were non-networked and did not allow for remote control. A disadvantage of such systems compared to modern \emph{smart} systems are the high cost of the coin acceptor and the overhead of site visits required to empty the coin box. % FIXME nice citation }. \subsection{Cryptographic coprocessors} Just like in legacy electricity meters in smart meters physical security is still a key component of the overall system design. Since in both types of meter cost depends on physical quantities being measured at the customer premises customers can save cost in case they are able to falsify the meter's measurements without being detected. For this reason both types of meters employ countermeasures against physical intrusion. Compared to high-risk devices such as card payment processing terminals or ATMs the tamper proofing used in smart meters is only basic. Common measures include sealing the case by irreversibly ultrasonically welding front and back plastic shells together or the use of security seals on the lid covering the input/output screw terminals. Low-tech attacks using magnets to saturate the current transformer's ferrite cores are detected using hall sensors\cite{itron01,hager01,easymeter01}. German smart metering standards are unique in that they specify the use of a smartcard-like security module to provide transport encryption and other cryptographic services\cite{bsi-tr-03109-2,bsi-tr-03109-2-a}. % FIXME compare to other places where things are not as nice \subsection{Physical structure and installation} Smart meters are installed like traditional electricity meters. In Japan this means they are usually installed on an exterior wall and need to be resistant against weather and extreme environmental conditions (direct sunlight, high temperature, high humidity). In Germany the meter is always installed either indoors or in an outdoor utility closet that is sealed to keep out the weather. In most countries the meter is connected through large integrated screw terminals. In the US meters compliant with the domestic ANSI C12 standard are round and plug into a large socket that is wired into the house or apartment's electrical connection. Modern smart meters are usually made with plastic cases. Ferraris meters often used cases stamped from sheet metal with glass windows on them. Smart meters now look much more like other modern electronic devices. A common construction style is to separate the case in a front and back half with both halves clipped or ultrasonically welded together. Ultrasonic welding gives a robust, airtight interface. This interface cannot easily be separated and re-connected without leaving visible traces, which helps with tamper evidence properties. As an industry-standard process common in various consumer goods ultrasonic welding is a cheap and accessible technology\cite{easymeter01,ifixit01}. Communication interfaces sometimes are brought out through regular electromechanical connectors but often also are optical interfaces. A popular style here is to use a regular UART connected to an LED/phototransistor optocoupler mounted on the side of the case. The user interface is usually limited to an LCD display. For cost and ingress protection smart meters rarely use mechanical buttons. Some smart meters use a phototransistor mounted behind the faceplate that can be activated with a flashlight as a crude contact-less input device\cite{easymeter01}. All meters provide several options for security seals to be installed to detect opening of the meter or access to its terminal block. The shape and type of these security seals varies. Factory-installed seals are used to detect tampering of the meter itself while seals made by the utility during meter installation are used to guard the meter's terminal block and detect attempts at by-passing\cite{czechowski01}. \section{Regulatory frameworks around the world} Smart metering regulation varies from country to country as it is tightly coupled to the overall regulation of the electrical grid. The standardization of the physical form factor and metrological parameters of a meter is usually separate from the standardization of its \emph{smart} functionality. Most countries base the standard for their meters' outwards-facing communication interface on a family of standards unified under the IEC as DLMS/COSEM. Employing this base protocol ountry-specific standardization only covers which precise variant of it is spoken and what features are supported. \subsection{International standards} The family of standards one encounters most in smart metering applications are IEC 62056 specifying the Device Language Message Specification (DLMS) and the Companion Specification for Electronic Metering (COSEM). DLMS/COSEM are application-layer standards describing a request/response schema similar to e.g.\ HTTP. DLMS/COSEM are mapped onto a multitude of wire protocols. They can be spoken over TCP/IP or mapped onto low-speed UART serial interfaces \cite{sato01,stuber01}. Besides DLMS/COSEM there are a multitude of standards usually specifying how DLMS/COSEM are to be applied. DLMS/COSEM show some amount of feature creep. They do not adhere to the age-old systems design adage that a tool should \emph{do one thing and do it well}. Instead they try to capture the convex hull of all possible applications. This led to a complicated design that requires extensive additional specification and testing to maintain even basic interoperability. In particular in the area of transport security it becomes evident that the IEC as an electrical engineering standards body stretched their area of expertise and resorting to established standard protocols would have improved the situation\cite{weith01}. Compared to industry-standard transport security the IEC standards provide a simplistic key management framework based on a static shared key with unlimited lifetime and provide sub-optimal transport security properties (e.g.\ lack of forward-secrecy)\cite{khurana01,sato01}. % TODO maybe expand this? \subsection{The regulatory situation in selected countries} In this section we will give an overview of the situation in a number of countries. This list of countries is not representative and notably does not include any developing countries and is geographically biased. We selected these countries for illustration only and based our selection in a large part on the availability of information in a language we read. We will conclude this section with a summarization of common themes. \subsubsection{Germany} Germany standardized smart metering on a national level. Apart from the calibration standards applying to any type of meter smart meters are covered by a set of communications and security standards developed by the German Federal Office for Information Security (BSI). Germany mandates smart meter installations for newly constructed buildings and during major renovations but does not require most legacy residential installations to be upgraded. This is a consequence of a 2013 cost-benefit analysis that found these upgrades to be uneconomical for the majority of residential customers\cite{bmwi03,bmwi1,bmwe01,brown01}. The German standards strictly separate between metering and communication functions. Both are split into separate devices, the \emph{meter} and the \emph{gateway} (called emph{smart meter gateway} in full and often abbreviated emph{SMGW}). One or several meters connect to a gateway through a COSEM-derived protocol. The communication interface between meter and gateway can optionally be physically unidirectional. An unidirectional interface eliminates any possibility of meter firmware compromise. The gateway contains a cryptographic security module similar to a smartcard\cite{mahlknecht01} that is entrusted with signing of measurements and maintaining an authenticated and encrypted communication channel with its authorities. Security of the system is certified according to a Common Criteria process. The German specification does not include any support for load switches outside of demand-side management as they are common in some other countries. It does not prohibit the installation of one behind the smart meter installation. This makes it theoretically possible for a utility company to still install a load switch to disconnect a customer, but this would be a spearate installation from the smart meter. In Germany there are significant barriers that have to be met before a utility company may cut power to a household\cite{delaw01}. The elision of a load switch means attacks on German meters will be limited in influence to billing irregularities and attacks using DSM equipment. % TODO elaborate DSM attacks vs. whole-household attacks in attacks section \subsubsection{The Netherlands} The Netherlands were early to take initiative to roll out smart metering after its recognition by the European Commission in 2006\cite{cuijpers01,ec04}. After overcoming political issuses the Netherlands were above the European median in 2018 having replaced almost half of all meters\cite{cuijpers01,ec03}. Dutch smart meters are standardized by a consortium of distribution system operators. They integrate gateway and metrology functions into one device. The utility-facing interface is a IEC DLMS/COSEM-based interface over cellular radio such as GPRS or LTE\cite{aubel01}. Like e.g.\ the German standard, the Dutch standard precisely specifies all communication interfaces of the meter\cite{dsmrp3}. Another parallel is that the Dutch standard also does not cover any functionality for remotely disconnecting a household. This absence of a load switch limits attacks on Dutch smart meters to causing billing irregularities. \subsubsection{The UK} The UK is currently undergoing a smart metering rollout. Meters in the UK are nationally standardized to provide both Zigbee ZSE-based and IEC DLMS/COSEM connectivity. UK smart metering specifications are shared between electrical and gas meters. Different to other countries' specifications the UK national specifications require electrical meters to have an integrated load switch and gas meters to have an integrated valve. In the UK a significant number of consumers are subject to prepaid electricity contracts. Prepayment and credit functionality are also specified in the national smart metering standard, as is remote firmware update functionality. Outside communications in these standards is performed through a gateway (there called \emph{communications hub}) that can be shared between several meters \cite{ukgov01,ukgov02,ukgov03,brown01,sato01}. The combination of both gas and electricity metering into one family of standards and the exceptionally large set of \emph{required} features make the UK regulations the maximalist among the ones in this section. The mandatory inclusion of both load switches and remote connectivity up to remote firmware update make it an interesting attack target. \subsubsection{Italy} Italy was among the first countries to legally mandate the widespread installation of smart meters in households. Italy in 2006 and 2007 by law set a starting date for the rollout in 2008\cite{brown01}. The Italian electricity market was recently privatized. While the wholesale market and transmission network privatization has advanced the vast majority of retail customers continued to use the incumbent distribution system operator ENEL as their supplier\cite{ec03}. This dominant position allowed ENEL to orchestrate the large-scale rollout of smart meters in Italy. Almost every meter in Italy had been replaced by a smart meter by 2018\cite{ec03}. An unique feature of the Italian smart metering infrastructure is that it relies on Powerline Communication (PLC) to bridge distances between meters and cellular radio gateways\cite{gungor01}. \subsubsection{Japan} Japan is currently rolling out smart metering infrastructure. Compared to other countries in Japan significant standardization effort has been spent on smart home integration.\cite{usitc01,sato01,brown01}. Japan has domestic standards (JIS) for metrology and physical dimensions. The TEPCO deployment currently being rolled out is based on the IEC DLMS/COSEM standards suite for remote meter reading in conjuction with the Japanese ECHONET protocol for the home-area network. Smart meters are connected to TEPCO's backend systems through the customer's internet connection, sub-gigahertz radio based on 802.15.4 framing, regular landline internet or PLC\cite{toshiba01,sato01}. A unique point in the Japanese utility metering landscape is that the current practice is monthly manual readings. In Japan residential utility meters are usually mounted outside the building on an exterior wall and every month someone with a mirror on a long stick will come and read the meter. The meter reader then makes a thermal paper print-out of the updated utility bill and puts it into the resident's post box. This practice gives consumers good control over their consumption but does incur significant pesonnel overhead. % TODO decide on citation. Maybe the toshiba one? \subsubsection{The USA} In the USA the rollout of smart meters has been promoted by law as early as 2005. The US electricity market is highly complex with states having significant authority to decide on their own policies\cite{brown01}. Different from the IEC standards used in large fraction of the rest of the world, the USA have their own domestic set of standards for smart meters developed by ANSI\cite{sato01}. The main difference between IEC and ANSI-standard meters is that ANSI-standard meters are round devices that plug into a wall-mounted socket while IEC devices are usually rectangular and connected directly to the mains wiring through large screw terminals\cite{ifixit01}. \subsection{Common themes} Researching the current situation around the world for the above sections we were able to distill some common themes. First, smart metering is slowly advancing on a global scale and despite significant reservations from privacy-conscious people and consumer advocates it seems it is here to stay. There are some notable exceptions of countries that have decided to scale-back an ongoing rollout effort after subsequent analysis showed economical or other issues\footnote{cf.\ the Netherlands and Germany}. \subsubsection{The introduction of smart metering} The smart meter rollout is largely driven by utility companies. Utility companies field a variety of arguments for the rollout. The most prominent argument is a general increase in energy-efficiency along with a reduction of emissions. This argument is based on the estimation that smart metering will increase private customers' awareness of their own consumption and this will lead them to reduce their consumption. The second highly popular argument for smart metering is that it is necessary for the widespread adoption of renewable energies. This argument again builds on the trend towards \emph{green} energy to rationalize smart metering. Often it is formulated as an \emph{inevitability} instead of a choice. Academic reception of smart metering is dyed with an almost unanimous enthusiasm. In particular smart meter communication infrastructure has received a large amount of research attention\cite{dzung01,gungor01,kabalci01,lloret01,mahmood01,yan01,anderson01}. Outside of human-computer interaction claims that smart meters will reduce customer energy consumption have often been uncritically accepted. \subsubsection{Standardization and reality of smart devices} Regulators, utilities and academics meet in their enthusiasm on the issue of smart home integration of smart metering. A feature of many setups is that the meter acts as the centerpiece of a modern, fully integrated smart home\cite{aubel01,geelen01,bsi-tr-03109-1,abdallah01}. The smart meter serves as a communication hub between a new class of grid-aware loads and the utility company's control center. Large (usually thermal) loads such as dishwashers, refrigerators and air conditioners are forecasted to intelligently adapt their heating/cooling cycles to better match the grid's supply. A frequent scenario is that in which the meter bills the customer using near-real time pricing, and supplies large loads in the customer's household with this pricing information. These loads then intelligently schedule their operation to minimize cost\cite{sato01}. At the time in the mid-2000nds when smart metering proposals were first advanced this vision might have been an effect of the \emph{law of the instrument}\cite{kaplan01}. Back then outside of specialty applications household devices were not usually networked\cite{merz01}. Smart meters at the time may have seemed the obvious choice for a smart home communications hub. From today's perspective, this idea is obviously outdated. Smart \emph{things} now have found their way into many homes. Only these things are directly interconnected through the internet--foregoing the home-area network (HAN) technologies anticipated by the smart metering pioneers. The simple reason for this is that nowadays anyone has Wifi, and Wifi transceivers have become inexpensive enough to disappear in the bill of materials (BOM) cost of a large home device such as a washing machine. Smart meters are usually situated in the basement--physically far away from most of one's devices. This makes connecting them to said devices awkward and connecting them via the local Wifi lends the question why the smart devices should not simply use the internet in the first place. Connecting things to a smart meter through a local bus is academically appealing. It promises cost-savings from a simpler physical layer (such as ZigBee instead of Wifi) and it neatly separates concerns into \emph{home infrastructure} and the regular internet. Communication between smart meter and devices never leaves the house. This gives potential additional tolerance to utility backend systems breaking. It also physically keeps communication inside the house, bypassing the utility's eyes improving both customer privacy and agency. The presently popular model of a device as simple as a light switch proxying its every action through a manufacturer's servers somewhere on the public internet is in stark contrast to this scenario. Alas, the reason that this model is as popular is that in most cases it simply works. Device manufacturers simply integrate one of many off-the-shelf Wifi modules. The resulting device will work anywhere on earth\footnote{For some places channel assignments may have to be updated. This is a configuration-level change and in some devices is done by the end-user during provisioning.}. A HAN-connected device would have several variants with different modems for different standards. Some might work across countries, but some might not. And in some countriese there might not even be a standard for smart grid HANs. Looking at the situation like this begs the question why this realization has not yet found its way into mainstream acceptance by smart metering implementors. The customer-facing functionality promised through smart meters would be simple to implement as part of a now-standard \emph{internet of things} application. An in-home display that shows real-time energy consumption and cost statistics would simply be an android tablet fetching summarized data from the utility's billing backend. Demand-side response by large loads would be as simple as an HTTP request with a token identifying the customer's contract that returns the electricity price the meter is currently charging along with a recommendation to switch on or off. It seems the smart home has already arrived while smart metering standardization is still getting off the starting blocks. % TODO is this too critical? Is maybe the modern smart home compatible with smart meters? Is maybe the local-only path % of data, avoiding utility clouds a design feature? (may be true in DE, NL, probably not anywhere else) \section{Security in smart distribution grids} The smart grid in practice is nothing more or less than an aggregation of embedded control and measurement devices that are part of a large control system. This implies that all the same security concerns that apply to embedded systems in general also apply to most components of a smart grid in some way. Where programmers have been struggling for decades now with input validation\cite{leveson01}, the same potential issue raises security concerns in smart grid scenarios as well\cite{mo01, lee01}. Only, in smart grid we have two complicating factors present: Many components are embedded systems, and as such inherently hard to update. Also, the smart grid and its control algorithms act as a large (partially-)distributed system, making problems such as input validation or authentication difficult to implement\cite{blaze01} and adding a host of distributed systems problems on top\cite{lamport01}. Given that the electrical grid is a major piece of essential infrastructure in modern civilization, these problems amount to significant issues in practice. Attacks on the electrical grid may have grave consequences\cite{anderson01,lee01} all the while the long maintenance cycles of various components make the system slow to adapt. Thus, components for the smart grid need to be built to a much higher standard of security than most consumer devices to ensure they live up to well-funded attackers even decades down the road. This requirement intensifies the challenges of embedded security and distributed systems security among others that are inherent in any modern complex technological system. The safety-critical nature of modern smart metering ecosystems in particular was quickly recognized by security experts\cite{anderson01}. A point we will not consider in much depth is theft of electricity. An incentive for the introduction of smart metering that is frequently cited in utility industry publications outside of a general public's view is the reduction of electricity theft\cite{czechowski01}. Academic papers tend to either focus on other benefits such as generation efficiency gains through better forecasting or try to rationalize the funamentally anti-consumer nature of smart metering with strenuous claims of ``enormous social benefits''\cite{mcdaniel01}. Academics rarely point out the large economical incentive such \emph{revenue protection} mechanisms provide\cite{anderson01}. This thesis will entirely focus on grid stability and discard electricity theft. For the attack scenarios we lay out billing inaccuracies of utility companies are of very low urgency compared to grid stability. In fact stability is a precondition for billing to happen. Additionally utility companies can already limit the volume of theft by cross-refrencing meter readings against trusted readings from upstream sections of the grid. This capability works even without smart meters and only gains speed from smart meters. A smart meter cannot prevent the customer from bypassing it with a section of wire. Due to the limit on its volume, electricity theft using smart meter hacking would not scale. Hackers would quickly be triangulated with no damage to consumers and limited damage to utility companies. \subsection{Privacy in the smart grid} A serious issue in smart metering setups is customer privacy. Even though the meter ``only'' collects aggregate energy consumption of a whole household this data is highly sensitive\cite{markham01}. This counterintuitive fact was initially overlooked in smart meter deployments leading to outrage, delays and reduced features\cite{cuijpers01}. The root cause for this is that given sufficient timing resolution these aggregate measurements contain ample entropy. Through disaggregation individual loads can be identified and through pattern matching even complex usage patterns can be discerned with alarming accuracy\cite{greveler01}. Similar privacy issues arise in many other areas of modern life through pervasive tracking and surveillance\cite{zuboff01}. What makes the case of smart metering worse is that even the fig leaf of consent such practices hide behind does not apply here. If I as a citizen do not consent to Google's privacy policy Google says I can choose not to use their service. In today's world this may not be a free choice making this argument totally invalid, but it is at least technically possible. Smart metering on the other hand is mandated by law. In some countries such as Germany a customer unwilling to accept the accompanying privacy violation cannot legally evade it\cite{bmwi04}. \subsection{Smart grid components as embedded devices} A fundamental challenge in smart grid implementations is the central role smart electricity meters play. Smart meters are used both for highly-granular load measurement and (in some countries) load switching\cite{zheng01}. Smart electricity meters are effectively consumer devices. They are built down to a certain price point that is measured by the burden it puts on consumers. The cost of a smart meter is ultimately limited by it being a major factor in the economies of a smart meter rollout\cite{bmwi03}. Cost requirements preclude some hardware features such as the use of a standard hardened software environment on a high-powerded embedded system (such as a hypervirtualized embedded linux setup) that would both increase resilience against attacks and simplify updates. Combined with the small market sizes in smart grid deployments \footnote{ Most vendors of smart electricity meters only serve a handful of markets. For the most part, smart meter development cost lies in the meter's software % TODO cite? There exist multiple competing standards applicable to various parts of a smart electricity meter. In addition, most countries have their own certification regimen\cite{cenelec01}. This complexity creates a large development burden for new market entrants\cite{perez01}. } this produces a high cost pressure on the software development process for smart electricity meters. \subsection{The state of the art in embedded security} Embedded security generally is much harder than security of higher-level systems. This is due to a combination of the unique constraints of embedded devices (hard to update, usually small quantity) and their lack of capabilities (processing power, memory protection functions, user interface devices). Even very well-funded companies continue to have serious problems securing their embedded systems. A spectacular example of this difficulty is the recently-exposed flaw in Apple's iPhone SoC first-stage ROM bootloader\footnote{ Modern system-on-chips integrate one or several CPUs with a multitude of peripherals, from memory and DMA controllers over 3D graphics accelerators down to general-purpose IO modules for controlling things like indicator LEDs. Most SoCs boot from one of several boot devices such as flash memory, ethernet or USB according to a configuration set e.g. by connecting some SoC pins a certain way or set by device-internal write-only fuse bits. Physically, one of the processing cores of the SoC (usually one of the main CPU cores) is connected such that it is taken out of reset before all other devices, and is tasked with switching on and configuring all other devices of the SoC. In order to run later intialization code or more advanced bootloaders, this core on startup runs a very small piece of code hard-burned into the SoC in the factory. This ROM loader initializes the most basic peripherals such as internal SRAM memory and selects a boot device for the next bootloader stage. Apple's ROM loader performs some authorization checks, to ensure no unauthorized software is loaded. The present flaw allows an attacker to circumvent these checks, booting code not authorized by Apple on a USB-connected iPhone, compromising Apple's chain of trust from ROM loader to userland right at its root. }, that allows a full compromise of any iPhone before the iPhone X. iPhone 8, one of the affected models, is still being manufactured and sold by Apple until April 2020. In another instance in 2016 researchers found multiple flaws in the secure-world firmware used by Samsung in their mobile phone SoCs. The flaws they found were both severe architectural flaws such as secret user input being passed through untrusted userspace processes without any protection and shocking cryptographic flaws such as CVE-2016-1919\footnote{\url{http://cve.circl.lu/cve/CVE-2016-1919}}\cite{kanonov01}. And Samsung is not the only large multinational corporation having trouble securing their secure world firmware implementation. In 2014 \textcite{rosenberg01} found an embarrassing integer overflow flaw in the low-level code handling untrusted input in Qualcomm's QSEE firmware. For an overview of ARM TrustZone including a survey of academic work and past security vulnerabilities of TrustZone-based firmware see \textcite{pinto01}. If all of these very large companies have trouble securing parts of their secure embedded software stacks measuring a mere few hundred bytes in Apple's case or a few kilobytes in Qualcomm's, what is a smart electricity meter manufacturer to do? For their mass-market phones, these two companies have R\&D budgets that dwarf some countries' national budgets. Since thorough formal verification of code is not yet within reach for either large-scale software development or code heavy in side-effects such as embedded firmware or industrial control software\cite{pariente01} the two most effective measures for embedded security is reducing the amount of code on one hand, and labour-intensively checking and double-checking this code on the other hand. A smart electricity manufacturer does not have a say in the former since it is bound by the official regulations it has to comply with, and will likely not have sufficient resources for the latter. We are left with an impasse: Manufacturers in this field likely do not have the saftey resources to keep up with complex standards requirements. At the same time they have no option to reduce the scope of their implementation to alleviate the burden on firmware security. \subsection{Attack avenues in the smart grid} If we model the smart grid as a control system responding to changes in inputs by regulating outputs, on a very high level we can see two general categories of attacks: Attacks that directly change the state of the outputs, and attacks that try to influence the outputs indirectly by changing the system's view of its inputs. The former would be an attack such as one that shuts down a power plant to decrease generation capacity\cite{lee01}. The latter would be an attack such as one that forges grid frequency measurements where they enter a power plant's control systems to provoke increasing oscillation in the amount of power generated by the plant according to the control systems' directions\cite{kosut01,wu01,kim01}. \subsubsection{Communication channel attacks} Communication channel attacks are attacks on the communication links between smart grid components. This could be attacks on IP-connected parts of the core network or attacks on shared busses between smart meters and IP gateways in substations. Generally, these attacks can be mitigated by securing the aforementioned communication links using modern cryptography. IP links can be protected using TLS, and more low-level busses can be protected using more lightweight Noise\cite{perrin01}-based protocols. Cryptographic security transforms an attackers ability to manipulate communication contents into a mere denial of service attack. Thus, in addition to cryptographic security safety under DoS conditions must be ensured to ensure continued system performance under attacks. This safety property is identical with the safety required to withstand random outages of components, such as communications link outages due to physical damage from storms, flooding etc\cite{sato01}. In general attacks at the meter level are hard to weaponize. Meters primarily serve billing purposes. The use of smart meter data for load forecasting is not yet common practice. Additionally smart meter data will only be used to refine existing forecasting models based on aggregate data collected at higher vantage points in the distribution grid. This combination of smart metering data with more trusted aggregate data from sensors within the grid infrastructure limits the potential impact of a data falsification attack on smart meters. It also allows the utility to identify potentially corrupt meter readings and thus detect manipulation above a certain threshold. In order for an attack to have more far-reaching consequences the attacker would need to compromise additional grid infrastructure\cite{kim01,kosut01}. \subsubsection{Exploiting centralized control systems} The type of smart grid attack most often cited in popular discourse, and to the author's knowledge the only type that has so far been conducted in practice, is a direct attack on centralized control systems. In this attack, computer components of control systems are compromised by the same techniques used to compromise any other kind of computer system such as spearfishing, exploiting insecure services running on internet-exposed ports and using one compromised system to compromise other systems on the same ostensably secure internal network. These attacks are very powerful as they yield the attacker direct control over whatever outputs the control systems are controlling. If an attacker manages to compromise the right set of control computers, they may even be able to cause a blackout\cite{lee01}. Despite their potentially large impact, these attacks are only moderately interesting from a scientific perspective. For one, their mitigation mostly consists of a straightforward application of security practices well-known for decades. Though there is room for the implementation of genuinely new, application-specific security systems in this field, the general state of the art is lacking behind other fields of embedded security. From this background low-hanging fruit should take priority\cite{heise02}. Given political will these systems can readily be secured. There is only a comparatively small number of them and having a technician drive to every one of them in turn to install a firmware security update is feasible. \subsubsection{Control function exploits} Control function exploits are attacks on the mathematical control loops used by the centralized control system. One example of this type of attack are resonance attacks as described in \textcite{wu01}. In this kind of attack, inputs from peripheral sensors indicating grid load to the centralized control system are carefully modified to cause a disproportionally large oscillation in control system action. This type of attack relies on complex resonance effects that arise when mechanical generators are electrically coupled. These resonances, coloquially called ``modes'' are well-studied in power system engineering\cite{rogers01,grebe01,entsoe01,crastan03}. Even disregarding modern attack scenarios, for stability electrical grids are designed with measures in place to dampen any resonances inherent to grid structure. Still, requiring an accurate grid model these resonances are hard to analyze and unlikely to be noiticed under normal operating conditions. Mitigation of these attacks can be achieved by ensuring unmodified sensor inputs to the control systems in the first place. Carefully designing control systems not to exhibit exploitable behavior such as oscillations is also possible but harder. \subsubsection{Endpoint exploits} One rather interesting attack on smart grid systems is one exploiting the grid's endpoint devices such as smart electricity meters. These meters are deployed on a massive scale, with at least one meter per household on average\footnote{Some households may have a separate meter for detached properties such as a detached garage or basement.}. Once compromised, restoration to an uncompromised state can potentially be very difficult if it requires physical access to thousands of devices hidden inaccessible in private homes. By compromising smart electricity meters, an attacker can trivially forge the distributed energy measurements these devices perform. In a best-case scenario, this might only affect billing and lead to customers being under- or over-charged if the attack is not noticed in time. In a less ideal scenario falsified energy measurements reported by these devices could impede the correct operation of centralized control systems. In some countries such as the UK smart meters have one additional function that is highly useful to an attacker: They contain high-current load switches to disconnect the entire household or business in case electricity bills are left unpaid for a certain period. In countries that use these kinds of systems on a widespread level, the load disconnect switch is controlled by the smart meter's central microcontroller. This allows anyone compromising this microcontroller's firmware to actuate the load switch at will. Given control over a large number of network-connected smart meters, an attacker might thus be able to cause large-scale disruptions of power consumption\cite{anderson01}. Combined with an attack method such as the resonance attack from \textcite{wu01} that was mentioned above, this scenario poses a serious danger to grid stability. In places where Demand-Side Management (DSM) is common this functionality may be abused in a similar way. In DSM the smart metering system directly controls power to certain devices such as heaters. The utility can remotely control the turn-on and turn-off of these devices to smoothen out the load curve. In exchange the customer is billed a lower price for the energy consumed by these loads. DSM was traditionally done with de-centralized systems mostly through low-frequency PLC over the distribution grid. Smart metering systems no longer require large, resource-intensive transmitters in substations and thus potentially allow the rollout of such technology on a much wider scale than before. This leads to a potentially significant role of DSM systems in the impact calculation of an attack on a smart metering system. DSM does not control as much load capacity as remote disconnect switches do. The attacks cited in the above paragraph still fundamentally apply. \subsection{Attacker models in the smart grid} % FIXME \subsection{Practical attacks} % FIXME \subsection{Practical threats} % FIXME \subsection{Conclusion, or why we are doomed} We can conclude that a compromise of a large number of smart electricity meters cannot be ruled out. The complexity of network-connected smart meter firmware makes it exceedingly unlikely that it is in fact flawless. Large-scale deployments of these devices under some circumstances such as where they are used with load disconnect relays make them an attractive target for attackers interested in causing grid instability. The attacker model for these devices very definitely includes enemy states, who have considerable resources at their disposal. For a reasonable guarantee that no large-scale compromises of hard- and software built today will happen over a span of some decades, we would have to radically simplify its design and limit attack surface. Unfortunately, the complexity of smart electricity meter implementations mostly stems from the large list of requirements these devices have to conform with. Additionally, standards have already been written and changes that reduce scope or functionality have become exceedingly unlikely at this point. A general observation with smart grid systems of any kind is that they comprise a departure from the decentralized control structure of yesterday's dumb grid and the advent of centralization at an enormous scale. This modern, centralized infrastructure has been carefully designed to defend against malicious actors%FIXME cite and all involved parties have an interest in keeping it secure. Still, like in any other system this centralization also makes for a very attractive target to attackers. An attacker can employ this centralized control to their advantage. Decentralized systems tend to make attacks more costly while centralized systems aid their efficiency. From this perspective the centralization of smart metering control sytems--sometimes at a national level\cite{anderson01}--poses a security risk. \chapter{Restoring endpoint safety in an age of smart devices} As laid out in the previous paragraph we cannot fully rule out a large-scale compromise of smart energy meters at some point in the long-term future. We have to rephrase our claim to security. We cannot rule out exploitation: We have to limit its impact. Assuming that we cannot strip any functionality from smart meters (it may be required by standards or for enormous social benefits\cite{mcdaniel01}). All we can do is to flush out an attacker once they are in, i.e.\ mitigation instead of prevention. In a worst-case scenario an attacker would gain unconstrained code execution (e.g.\ by exploiting a flaw in a network protocol implentation). Smart meters use standard microcontrollers that do not have advanced memory protection functions (cf.\ Section \ref{sm-cpu}). We can assume the attacker has full control over the main microcontroller given any such flaw. With this control they can actuate the load switch if present. They can transmit data through the device's communication interfaces or use the user interface components such as LEDs and the LCD. Using the self-programming capabilities of flash microcontrollers an attacker may even gain persistency. Note that in systems separating cryptographic functions into some form of cryptographic module\footnote{such as systems used in Germany\cite{bsi-tr-03109}.} we can be optimistic and assume the attacker has not yet compromised this cryptographic co-processor. With the meter's core microcontroller under attacker control we cannot use this microcontroller to restore control over the system. We have no way of ensuring the attacker does not simply delete a security mechanism we include in the core microcontroller's firmware. Our solution to this problem is to add another smaller microcontroller to the smart meter design. This microcontroller will contain a small piece of software that receives cryptographically authenticated commands from utility companies. On demand it can reset the meter's core microcontroller to a known-good state. To reliably flush out an attacker from a compromised core microcontroller we re-program the core microcontroller in its entirety. We propose using JTAG to re-program the core microcontroller with a known-good firmware image read from a sufficiently large SPI flash connected to the reset controller. JTAG is supported by most microcontrollers complex enough to be used in a smart meter design. JTAG programming functionality can be ported to a new microcontroller with relatively little work. Our solution requires the core mircocontroller's JTAG interface to be activated (i.e. not fused-shut). For our solution to work the core microcontroller firmware must not be able to permanently disable the JTAG interface by itself. In microcontrollers that do not yet provide this functionality this is a minor change that could be added to a custom microcontroller variant at low cost. On most microcontrollers keeping JTAG open should not interfere with code readout protection\footnote{Readout protection usually forces a device erase before allowing JTAG access.}. Code secrecy should be of no concern\cite{schneier01} here but some manufacturers have strong preferences due to a fear of copyright infringement. \section{The theory of endpoint safety} \label{sec_criteria} In order to gain anything by adding our reset controller to the smart meter's already complex design we must satisfy two interrelated conditions. \begin{enumerate} \item \textsc{security} means our reset controller itself does not have any remotely exploitable flaws \item \textsc{safety} menas our reset controller will perform its job as intended \end{enumerate} Note that our \textsc{security} property includes only remote exploitation, and excludes any form of hardware attack. Even though most smart meters provide some level of physical security, we do not wish to make any assumptions on this. In the following section we will elaborate our attacker model and it will become apparent that sufficient physical security to defend against all attackers in our model would be infeasible, and thus we will design our overall system to remain secure even assuming some number of physically compromised devices. % FIXME expand \subsection{Attack characteristics} The attacker model these two conditions must hold under is as follows. We assume three angles of attack: Attacks by the customer themselves, attacks by an insider within the metering systems controlling utility company and lastly attacks from third parties. Examples for these third parties are hobbyist hackers or outside cyber-criminals on the one hand, but also other companies participating in the smart grid infrastructure besides the utility company such as intermediary providers of meter-reading services. Due to the critical nature of the electrical grid, we have to include hostile state actors in our attacker model. When acting directly, these would be classified as third-party attackers by the above schema, but they can reasonably be expected to be able to assume either of the other two roles as well e.g. through infiltration or bribery. \textcite{fraunholz01} in their elaboration of their generalized attacker model give some classification of attackers and provide a nice taxonomy of attacker properties. In their threat/capability rating, criminals are still considered to have higher threat rating than state-sponsored attackers. The New York Times reported in 2016 that some states recruit their hacking personnel in part from cyber-criminals. If this report is true, in a worst-case scenario we have to assume a state-sponsored attacker to be the worst of both types. Comparing this against the other attacker types in \textcite{fraunholz01}, this state-sponsored attacker is strictly worse than any other type in both variables. We are left with a highly-skilled, very well-funded, highly intentional and motivated attacker. Based on the above classification of attack angles and our observations on state-sponsored attacks, we can adapt \textcite{fraunholz01} to our problem, yielding the following new attacker types: \begin{enumerate} \item \textbf{Utility company insiders controlled by a state actor} We can ignore the other internal threats described in \textcite{fraunholz01} since an insider cooperating with a state actor is strictly worse in every respect. \item \textbf{State-sponsored external attackers} A state actor can directly attack the system through the internet. \item \textbf{Customers controlled by a state actor} A state actor can very well compromise some customers for their purposes. They might either physically infiltrate the system posing as legitimate customers, or they might simply deceive or bribe existing customers into cooperation. \item \textbf{Regular customers} Though a hostile state actor might gain control of some number of customers through means such as voluntary cooperation, bribery, infiltration, they are limited in attack scale since they do not want to arouse premature attention. Though regular customers may not have the motivation, skill or resources of a state-sponsored attacker, potentially large numbers of them may try to attack a system out of financial incentives. To allow for this possibility, we consider regular customers separate from state actors posing as customers in some way. \end{enumerate} \subsection{Overall structural system security} Considering overall security, we first introduce the \emph{reset authority}, a trusted party acting as the single authority for issuing reset commands in our system. In practice this trusted party may be part of the utility company, part of an external regulatory body or a hybrid setup requiring both to cooperate. We assume this party will be designed to be secure against all of the above attacker types. The precise design of this trusted party is out of scope for this work but we will list some practical suggestions on how to achieve security below. % FIXME do the list % FIXME put up a large box on this limitation Using an asymmetric cryptographic design centered around the \emph{reset authority}, we rule out all attacks except for denial-of-service attacks on our system by any of the four attacker types. All reset commands in our system originate from the \emph{reset authority} and are cryptographically secured to provide authentication and tamper detection. Under this model, attacks on the electrical grid components between the \emph{reset authority} and the customer device degrade into man-in-the-middle attacks. To ensure the \textsc{safety} criterion from Section \ref{sec_criteria} holds we must make sure our cryptography is secure against man-in-the-middle attacks and we must try to harden the system against denial-of-service attacks by the attacker types listed above. Given our attacker model we cannot fully guard against this sort of attack but we can at least choose a commmunication channel that is resilient against denial of service attacks under the above model. Finally, we have to consider the issue of hardware security. We will solve the problem of physical attacks on some small number of devices by simply not programming any secret information into these devices. This also simplifies hardware production. From consideration in this work we explicitly rule out any form of supply-chain attack as out-of-scope. % FIXME include considerations on production testing somewhere (is the device working? is the right key programmed?) \subsection{Complex microcontroller firmware} The \textsc{security} property from \ref{sec_criteria} is in a large part reliant on the security of our reset controller firmware. The best method to increase firmware security is to reduce attack surface by limiting external interfaces as much as possible and by reducing code complexity as much as possible. % FIXME formalize this as something like "Design Goal DG-023-42-1" ? If we avoid the complexity of most modern microcontroller firmware we gain another benefit beyond implicitly reduced attack surface: If the resulting design is small enough we may attempt formal verification of our security property. Though formal verification tools are not yet suitable for highly complex tasks they are already adequate for small amounts of code and simple interfaces. \subsection{Modern microcontroller hardware} Microcontrollers have gained enormously in both performance/efficiency as well as in peripheral support. Alas, these gains have largely been driven by insatiable customer demand for faster, more powerful chips and for a long time security has not been considered important outside of some specific niches such as smartcards. Traditionally a microcontroller would spend its entire lifetime without ever being exposed to any networks. Though this trend has been reversing with the increasing adoption of internet-of-things things and more advanced security features have started appearing in general-purpose microcontrollers, most still lack even basic functionality found in processors for computers or smartphones. One of the components lacking from most microcontrollers is strong memory protection or even a memory mapping unit as it is found in all modern computer processors and SoCs for applications such as smartphones. Without an MPU/MPU some mitigations for memory safety violations cannot be implemented. This and the absence of virtualization tools such as ARM's TrustZone make hardening microcontroller firmware a big task. It is very important to ensure memory safety in microcontroller firmware through tools such as defensive coding, extensive testing and formal verification. In our design we achieve simplicity on two levels: One, we isolate the very complex metering firmware from our reset controller by having both run on separate microcontrollers. Two, we keep the reset controller firmware itself extremely simple to reduce attack surface there. \subsection{Regulatory and economical constraints} %FIXME \subsection{Safety vs. security: Opting for restoration instead of prevention} By implementing our reset system as a physically separate microcontroller we sidestep most security issues around the main application microcontroller. There are some simple measures that can be taken to harden this firmware. Implementing industry best practices such as memory protection or stack canaries will harden the system and increase the cost of an attack but it will not yield a system that we can be confident enough in to say it is fully secure. The complexity of the main application controller firmware makes fully securing the system a formidable effort--and one that would have to be repeated by every meter vendor for every one of their code bases. In contrast to this our reset system does not provide any additional security. Any attack that could occur without it can still occur with it in place. What it provides is a fail-safe mechanism that can quickly immobilize a malicious actor even mid-attack. It does this in a way that can be adapted to any meter architecture and any microcontroller platform with low effort since it relies on established standard interfaces such as JTAG and SWD. Concentrating research and development resources on a single platform like this allows for a system that is more economical to implement across device series and across vendors. Attack resilience in the power grid can benefit from a safety-focused approach. The greater danger such an attack poses is not the temporary denial of service of utility metering functions. Even in a highly integrated smart grid as envisioned by utility companies their measurement functions are used by utility companies to increase efficiency and reduce cost but are not necessary for the grid to function at all. % TODO citation Thus if we can provide mere \emph{safety} with a fail-safe semantic instead of unattainable perfect \emph{security} we have gained resilience against a large class of realistic attack scenarios. \subsection{Technical outline of a safety reset system} There are several ways our system could be practically implemented. The most basic way is to add a separate microcontroller connected to the meter's main application MCU and optionally other embedded microcontrollers such as modems. This discrete chip could either be placed on the metering board itself or it could be placed on a separate PCB connected to the programming interface(s) of the metering board. In certain cases the latter might allow use in otherwise unmodified legacy designs. The saftey reset controller would be a much simpler MCU than the meter's main application controller. Its software can be held simple leading to low program flash and RAM requirements. Since it does not need to address rich periphery such as external parallel memory, LCDs etc.\ it can be a physically small, low-pin count device. If the main application controller is supposed to be reset to a full factory image with little or no reduced functionality its firmware image size is certainly too large for the reset controller's embedded flash. Thus a realistic setup would likely use an external SPI flash chip to store this image. The most likely interfaces to reset the main application controller and possibly other microcontrollers such as modem chips would be the controller's integrated programming port such as JTAG. There exist a variety of programming interfaces for microcontrollers but for moderately complex ones JTAG has grown to be by far the most broadly supported one. Parallel high-voltage flash programming has come to be uncommon in modern microcontrollers and most chips nowadays use some form of a serial interface. Some vendors have their own proprietary serial in-system programming interfaces that they use on certain parts instead of or in addition to JTAG. The reasons for this usually are either lower complexity in parts that do not require full debugging capabilities as provided by JTAG or the high pin count of JTAG. The kind of microcontroller that would likely be used as the main application controller in a smart meter application will almost certainly support JTAG. These microcontrollers are high pin-count devices since they need to connect to a large set of peripherals such as the LCD and the large program flash makes it likely for a proper debugging interface to be present. The one remaining issue in this coarse technical outline is what communication interface should be used to transmit the trigger command to the reset controller. In the following section we will give an overview on communication interfaces established in energy metering applications and evaluate each of them for our purpose. \section{Communication channels on the grid} There is a number of well-established technologies for communication on or along power lines. We can distinguish three basic system categories: Systems using separate wires (such as DSL over landline telephone wiring), wireless radio systems (such as LTE) and \emph{powerline communication} (PLC) systems that re-use the existing mains wiring and superimpose data transmissions on the 50 Hz mains sine\cite{gungor01,kabalci01}. For our scenario, we will ignore short-range communication systems. There exists a large number of \emph{wideband} powerline communication systems that are popular with consumers for bridging ethernet between parts of an apartment or house. These systems transmit at up to several hundred megabits over distances up to several tens of meters\cite{kabalci01}. Technologically, these wideband PLC systems are very different from \emph{narrowband} systems used by utilities for load management among other applications and they are not relevant to our analysis. \subsection{Powerline communication (PLC) systems and their use} In long-distance communications for applications such as load management, PLC systems are attractive since they allow re-using the existing wiring infrastructure and have been used as early as in the 1930s\cite{hovi01}. Narrowband PLC systems are a potentially low-cost solution to the problem of transmitting data at small bandwidth over distances of several hundred meters up to tens of kilometers. Narrowband PLC systems transmit on the order of kilobits per second or slower. A common use of this sort of system are \emph{ripple control} systems. These systems superimpose a low-frequency signal at some few hundred Hertz carrier frequency on top of the 50Hz mains sine. This low-frequency signal is used to encode switching commands for non-essential residential or industrial loads. Ripple control systems provide utilities with the ability to actively control demand while promising small savings in electricity cost to consumers\cite{dzung01}. In any PLC system there is a strict tradeoff between bandwidth, power and distance. Higher bandwidth requires higher power and reduces maximum transmission distance. Where ripple control systems usually use few transmitters to cover the entire grid of a regional distribution utility, higher-bandwidth bidirectional systems used for automatic meter reading (AMR) in places such as italy or france require repeaters within a few hundred meters of a transmitter. \subsection{Landline and wireless IP-based systems} Especially in automated meter reading (AMR) infrastructure the cost-benefit tradeoff of powerline systems does not always work out for utilities. A common alternative in these systems is to use the public internet for communication. Using the public internet has the advantage of low initial investment on the part of the utility company as well as quick commissioning. Disadvantages compared to a PLC system are potentially higher operational costs due to recurring fees to network providers as well as lower reliability. Being integrated into power grid infrastructure, a PLC system's failure modes are highly correlated with the overall grid. Put briefly, if the PLC interface is down, there is a good chance that power is out, too. In contrast to this general internet services exhibit a multitude of failures that are entirely decorrelated from power grid stability. For purposes such as meter reading for billing purposes, this stability is sufficient. However for systems that need to hold up in crisis situations such as the recovery system we are contemplating in this thesis, the public internet may not provide sufficient reliability. \subsection{Short-range wireless systems} Smart meters contain copious amonuts of firmware but still pale in comparison to the complexity of full-scale computers such as smartphones. For short-range communication between a meter and a cellular radio gateway mounted nearby or between a meter an an meter reading operator in a vehicle on the street a protocol such as Wifi (802.11) might be too complex in most cases. Absent widely-used standards in this space proprietary radio protocols instead grow very attractive. These might be based on some standardized lower-level protocol such as ZigBee (802.15) or might be entirely home-grown. To a meter manufacturer a proprietary radio protocol has several advantages. It is easy to implement and requires zero external certification. It can be customized to its specific application. In addition it provides some level of vendor lock-in to customers sharing infrastructure such as a cellular radio gateway between multiple devices. In other fields where a lack of standardization has led to a proliferation of proprietary protocols such as home automation this has led to a fragmented protocol landscape. In other fields this is a large problem since consumer cannot easily integrated products made by different manufacturers into one system. In advanced metering infrastructure this is unlikely to be a disadvantage since ususally there is only one distribution grid operator for an area. Additionally shared resources such as a cellular radio gateway would most likely only be shared within a single building and within a single building usually all meters are operated by the same provider. Systems in Europe commonly support Wireless M-Bus, an european standardized protocol\cite{silabs01} that operates on several ISM bands\footnote{ Frequency bands that can be used for \emph{Industrial, Scientific and Medical} applications by anyone and that do not require obtaining a license for transmitter operation. Manufacturers can use whatever protocol they like on these bands as long as they obtain certification that their transmitters obey certain spectral and power limitations. }. ZigBee is another popular standard and some vendors additionally support their own proprietary protcols\footnote{ For an example see \textcite{honeywell01} }. % TODO expand this? \subsection{Frequency modulation as a communication channel} For our system, we chose grid frequency modulation (henceforth GFM) as a low-bandwidth uni-directional broadcast communications channel. Compared to traditional PLC GFM requires only a small amount of additional hardware, works reliably throughout the grid and is harder to manipulate by a malicious actor. Grid frequency in europe's synchronous areas is nominally 50 Hertz, but there are small load-dependent variations from this nominal value. Any device connected to the power grid (or even just within physical proximity of power wiring) can reliably and accurately measure grid frequency at low hardware overhead. By intentionally modifying grid frequency, we can create a very low-bandwidth broadcast communication channel. Grid frequency modulation has only ever been proposed as a communications channel at very small scales in microgrids before\cite{urtasun01} but to our knowledge has not yet been considered for large-scale application. Advantages of using grid frequency for communication are low receiver hardware complexity as well as the fact that a single transmitter can cover an entire synchronous area. Though the transmitter has to be very large and powerful, setup of a single large transmitter faces lower bureaucratic hurdles than integration of hundreds of smaller ones into hundreds of local systems each with autonomous goverance. \subsubsection{The frequency dependency of grid frequency} Despite the awesome complexity of large power grids the physics underlying their response to changes in load and generation is surprisingly simple. Individual machines (loads and generators) can be approximated by a small number of differential equations and the entire grid can be modelled by aggregating these approximations into a large system of nonlinear differential equations. Evaluating these systems it has been found that in large power grids small-signal steady-state changes in generation/consumption power balance cause an approximately linear change in frequency\cite{kundur01,crastan03,entsoe02,entsoe04}. \emph{Small signal} here describes changes in power balance that are small compared to overall grid power. \emph{Steady state} describes changes over a timeframe of multiple cycles as opposed to transient events that only last a few milliseconds. This approximately linear relationship allows the specification of a coefficient linking $\Delta P$ and $\Delta f$ with unit \si{\watt\per\hertz}. In this thesis we are using the European power grid as our model system. We are using data provided by ENTSO-E (formerly UCTE), the governing association of european transmission system operators. In our calculations we use data for the continental european synchronous area, the largest synchronous area. $\frac{\Delta P}{\Delta f}$, called \emph{Overall Network Power Frequency Characteristic} by ENTSO-E is around \SI{25}{\giga\watt\per\hertz}. We can derive general design parameter for any system utilizing grid frequency as a communications channel from the policies of ENTSO-E\cite{entsoe02,entsoe03}. Probably any such system should stay below a modulation amplitude of \SI{100}{\milli\hertz} which is the threshold defined in the ENTSO-E incidents classification scale for a Scale 0-1 (from "Anomaly" to "Noteworthy Incident" scale) frequency degradation incident\cite{entsoe03} in the continental europe synchronous area. \subsubsection{Control systems coupled to grid frequency} The ENTSO-E Operations Handbook Policy 1 chapter defines the activation threshold of primary control to be \SI{20}{\milli\hertz}. Ideally a modulation system would stay well below this threshold to avoid fighting the primary control reserve. Modulation line rate should probably be on the order of a few hundred millibaud. % TODO is using "probably" here and in the previous paragraph ok? Modulation at such high rates would outpace primary control action which is specified by ENTSO-E as acting within between ``a few seconds'' and \SI{15}{\second}. The effective \emph{Network Power Frequency Characteristic} of primary control in the european grid is reported by ENTSO-E at around \SI{20}{\giga\watt\per\hertz}. Keeping modulation amplitude below this threshold would help to avoid spuriously triggering these control functions. This works out to an upper bound on modulation power of \SI{20}{\mega\watt\per\milli\hertz}. \subsubsection{An outline of practical transmitter implementation} In its most basic form a transmitter for grid frequency modulation would be a very large controllable load connected to the power grid at a suitable vantage point. A spool of wire submerged in a body of cooling water (such as a small lake with a fence around it) along with a thyristor rectifier bank would likely suffice to perform this function during occassional cybersecurity incidents. We can however decrease hardware and maintenance investment even further compared to this rather uncultivated solution by repurposing regular large industrial loads to our transmitter purposes in an emergency situation. For some preliminary exploration we went through a list of energy-intensive industries in Europe\cite{ec01}. The most electricity-intensive industries in this list are primary aluminium and steel production. In primary production raw ore is converted into raw metal for further refinement such as casting, rolling or extrusion. In steelmaking iron is smolten in an electric arc furnace. In aluminium smelting aluminium is electrolytically extracted from alumina. Both processes involve large amounts of electricity with electricity making up \SI{40}{\percent} of production costs. Given these circumstances a steel mill or aluminium smelter would be good candidates as transmitters in a grid frequency modulation system. In aluminium smelting high-voltage mains is transformed, rectified and fed into about 100 series-connected cells forming a \emph{potline}. Inside the pots alumina is dissolved in molten cryolite electrolyte at about \SI{1000}{\degreeCelsius} and electrolysis is performed using a current of tens or hundreds of kiloampere. Resulting pure aluminium settles at the bottom of the cell and is tapped off for further processing. Like steelworks, aluminium smelters are operated night and day without interruption. Aside from metallurgical issues the large thermal mass and enormous heating power requirements do not permit power-cycling. Due to the high costs of production inefficiencies or interruptions the behavior of aluminium smelters under power outages is a fairly well-characterized phenomenon in the industry. The recent move away from nuclear power and to renewable energy has lead to an increase in fluctuations of electricity price throughout the day. These electricity price fluctuations have provided enough economic incentive to aluminium smelters to develop techniques to modulate smelter power consumption without affecting cell lifetime or the output product\cite{duessel01,eisma01}. Power outages of tens of minutes up to two hours reportedly do not cause problems in aluminium potlines and are in fact part of routine operation for purposes such as electrode changes\cite{eisma01,oye01}. The power supply system of an aluminium plant is managed through a highly-integrated control system as keeping all cells of a potline under optimal operating conditions is challenging. Modern power supply systems employ large banks of diodes or SCRs to rectify low-voltage AC to DC to be fed into the potline\cite{ayoub01}. The potline voltage can be controlled almost continuously through a combination of a tap changer and a transductor. The individual cell voltages can be controlled by changing the anode to cathode distance (ACD) by physically lowering or raising the anode. The potline power supply is connected to the high voltage input and to the potline through isolators and breakers. In an aluminium smelter most of the power is sunk into resistive losses and the electrolysis process. As such an aluminium smelter does not have any significant electromechanical inertia compared to the large rotating machines used in other industries. Depending on the capabilities of the rectifier controls high slew rates should be possible, permitting modulation at high\footnote{Aluminium smelter rectifiers are \emph{pulse rectifiers}. This means instead of simply rectifying the incoming three-phase voltage they use a special configuration of transformer secondaries and in some cases additional coils to produce a large number (such as 6) of equally spaced phases. Where a direct-connected three-phase rectifier would draw current in 6 pulses per cycle a pulse rectifier draws current in more, smaller pulses to increase power factor. E.g. a 12-pulse rectifier will draw current in 12 pulses per cycle. In the best case an SCR pulse rectifier switched at zero crossing should allow \SIrange{0}{100}{\percent} load changes from one rectifier pulse to the next, i.e. within a fraction of a single cycle.} data rates. % FIXME validate this \subsubsection with an expert \subsubsection{Avoiding dangerous modes} Modern power systems are complex electromechanical systems. Each component is controlled by several carefully tuned feedback loops to ensure voltage, load and frequency regulation. Multiple components are coupled through transmission lines that themselves exhibit complex dynamic behavior. The overall system is generally stable, but may exhbit some instabilities to particular small-signal stimuli\cite{kundur01,crastan03}. These instabilities, called \emph{modes} occur when due to mis-tuning of parameters or physical constraints the overall system exhibits oscillation at particular frequencies. \textcite{kundur01} split these into four categories: \begin{description} \item[Local modes] where a single power station oscillates in some parameter \item[Interarea modes] where subsections of the overall grid oscillate w.r.t.\ each other due to weak coupling between them \item[Control modes] caused by imperfectly tuned control systems \item[Torsional modes] that originate from electromechanical oscillations in the generator itself \end{description} The oscillation frequencies associated with each of these modes are usually between a few tens of Millihertz and a few Hertz, see for example \textcite{grebe01} and \textcite{entsoe01}. It is hard to predict the particular modes of a power system at the scale of the central-european interconnected system. Theoretical analysis and simulation may give rough indications but cannot yield conclusive results. Due to the obvious danger as well as high economical impact due to inefficiencies experimental measurements are infeasible. Finally, modes are highly dependent on the power grid's structure and will change with changes in the power grid over time. For all of these reasons, a grid frequency modulation system must be designed very conservatively without relying on the absence (or presence) of modes at particular frequencies. A concrete design guideline that we can derive from this situation is that the frequency spectrum of any grid frequency modulation system should not exhibit any notable peaks and should avoid a concentration of spectral energy in certain frequency ranges. \subsubsection{Overall system parameters} In conclusion we end up with the following tunable parameters for a grid frequency modulation based on a large controllable load: \begin{description} \item[Modulation amplitude] proportionally related to modulation power. In a practical setup we might realize a modulation power up to a few hundred \si{\mega\watt} which would yield maybe a few tens of \si{\milli\hertz} of frequency amplitude. \item[Modulation pre-emphasis and slew-rate control]. Pre-emphasis might be necessary to ensure an adequate Signal-to-Noise ratio (SNR) at the receiver. Slew-rate control and other shaping measures might be necessary to reduce the impact of these sudden load changes on the transmitter's primary function (say, aluminium smelting) and to prevent disturbances to grid components. \item[Modulation frequency]. For a practical implementation a careful study would be necessary to determine an optimal frequency band for operation. On one hand we need to prevent disturbances to the grid such as through excitation of some local or inter-area modes. On the other hand we need to optimize Signal-to-Noise ratio (SNR) and data rate to achieve optimal latency between transmission start and successful reception and to reduce the overall burden on transmitter and grid. \item[Further modulation parameters]. The modulation itself has numerous parameters that are discussed in sec.\ \ref{mod_params} below. \end{description} \section{From grid frequency to a reliable communication channel} \subsection{Channel properties} In this section we will explore how we can construct a reliable communication channel from the analog primitive we outline in the previous section. Our load control approach to grid frequency modulation leads to a channel with the following properties. \begin{description} \item[Slow-changing.] Accurate grid frequency measurements need several periods of the mains sine wave. Faster sampling rates can be achieved with more complex specialized synchrophasor estimation algorithms but this will result in a tradeoff between sampling rate and accuracy\cite{belega01}. \item[Analog.] Grid frequency is an analog signal. \item[Noisy.] While stable over long periods of time thanks to Load-Frequency Control\cite{entsoe04} it shows considerable random short-term variations. In addition our modulation amplitude is limited by technical and economic constraints so we have to find a system that will work at poor SNRs. \item[Polarized.] Grid frequency measurements have an inherent sense of \emph{up} (higher frequencies). We can use this in a polarized modulation scheme to encode information without first transmitting some reference signal to establish this polarization. \end{description} \subsection{Modulation and its parameters} \label{mod_params} In this section we will consider how to select a good set of parameters for a modulation scheme fitting grid frequency modulation. The sensitivity of the grid to oscillation at particular frequencies described above means we should avoid any modulation technique that would concentrate a lot of energy in a small bandwidth. Taking this principle to its extreme provides us with a useful pointer towards techniques that might work well: Spread-spectrum techniques. By employing spread-spectrum modulation we can produce an almost ideal frequency-domain behavior that spreads the modulation energy almost flat across the modulation bandwidth\cite{goiser01} while at the same time achieving some modulation gain, increasing system sensitivity. This modulation gain spread-spectrum techniques yield potentially allows us to use a weaker stimulus, allowing further reduction of the probability of disturbance to the overall system. Spread-spectrum techniques also inherently allow us to tune the tradeoff between receiver sensitivity and data rate. This tunability is a highly useful parameter to have for the overall system design. Spread spectrum covers a whole family of techniques. \textcite{goiser01} separates these techniques into the coarse categories of \emph{Direct Sequence Spread Spectrum}, \emph{Frequency Hopping Spread Spectrum} and \emph{Time Hopping Spread Spectrum}. \textcite{goiser01} assumes a BPSK or similar modulation underlying the spread-spectrum technique. Our grid frequency modulation channel effectively behaves more like a DC-coupled wire than a traditional radio channel: Any change in excitation will cause a proportional change in the receiver's measurement. Using our fft-based measurement methodology we get a real-valued signed quantity. In this way grid frequency modulation is similar to a channel using coherent modulation. We can transmit not only signal strength, but polarity too. For our purposes we can discount both Time and Frequency Hopping Spread Spectrum techniques. Time hopping aids to reduce interference between multiple transmitters but does not help with SNR any more than Direct Sequence does. % FIXME verify this. Our system is strictly limited to a single transmitter so we do not gain anything through Time Hopping. Frequency Hopping Spread Spectrum techniques require a carrier. Grid frequency modulation itself is very limited in peak frequency deviation $\Delta f$. Frequency hopping could only be implemented as a second modulation on top of GFM, but this would not yield any benefits while increasing system complexity and decreasing data bandwidth. Direct Sequence Spread Spectrum is the only remaining approach for our application. Direct Sequence Spread Spectrum works by directly modulating a long pseudorandom bit sequence onto the channel. The receiver must know the same pseudo-random bit sequence and continuously calculates the correlation between the received signal and the pseudo-random template sequence mapped from binary $[0, 1]$ to bipolar $[1, -1]$. The pseudorandom sequence has approximately equal number of $0$ and $1$ bits the correlation between the sequence and uncorrelated noise is small. The positive contribution of the $+1$ terms of the correlation template approximately cancel out with the $-1$ terms when multiplied with an uncorrelated signal such as white gaussian noise or another pseudo-random sequence. By using a family of pseudo-random sequences with low cross-correlation channel capacity can be increased. Either the transmitter can encode data in the choice of sequence or multiple transmitters can use the same channel at once. The longer the pseudo-random sequence the lower its cross-correlation with noise or other pseudorandom sequences of the same length. Choosing a long sequence we increase modulation gain while decreasing bandwidth. For any given application the sweet spot will be the shortest sequence that is long enough to yield sufficient SNR for subsequent processing layers such as channel coding. A popular code used in many DSSS systems are Gold codes. A set of Gold codes has small cross-correlations. For some value $n$ a set of Gold codes contains $2^n + 1$ sequences of length $2^n - 1$. Gold codes are generated from two different maximum length sequences generated by linear feedback shift registers (LFSRs). For any bit count $n$ there are certain empirically determined preferred pairs of LFSRs that produce Gold codes with especially good cross-correlation. The $2^n + 1$ gold codes are defined as the XOR sum of both LFSR sequences shifted from $0$ to $2^n-1$ bit as well as the two individual LFSR sequences. Given LFSR sequences \texttt{a} and \texttt{b} in numpy notation this is \mintinline{python}{[a, b] + [ a ^ np.roll(b, shift) for shift in len(b) ]}. In DSSS modulation the individual bits of the DSSS sequence are called \emph{chips}. Chip duration determines modulation bandwidth\cite{goiser01}. In our system we are directly modulating DSSS chips on mains frequency without an underlying modulation such as BPSK as it is commonly used in DSSS systems. \subsection{Error-correcting codes} To make our overall system reliable we have to layer some channel coding on top of our DSSS modulation. The messages we expect to transmit are at least a few tens of bits long. We are highly constrained in SNR due to limited transmission power. With lower SNR comes higher BER (bit error rate). Packet error rate grows exponentially with transmission length. For our relatively long transmissions we would realistically get unacceptable error rates. Error correcting codes are a very broad field with many options for specialization. Since we are implementing nothing more than a prototype in this thesis we chose to not expend resources on optimization too much and settled for a comparatively simple low-density parity check code. The state of the art has advanced considerably since the discovery of general LDPC codes. %FIXME cite % FIXME LDPC is old, new is Reed-Solomon! The main areas of improvement are overhead and decoding speed. Since transmission length % FIXME have we defined this yet? in our system limits system response time but we do not have a fixed target there we can tolerate some degree of sub-optimal overhead. % FIXME get actual pröper numbers on our stuff vs. some state of the art citations. Decoding speed is of no concern to us as our data rate is extremely low. An important concern for our prototype implementation was the availability of reference implementations of our error correcting code. We need a python implementation for test signal generation on a regular computer and we need a small C or C++ implementation that we can adapt to embedded firmware. LDPC codes are a popular textbook example of error-correcting codes and we had no particular difficulty finding either. \subsection{Cryptographic security} \label{sec-crypto} Informally the system we are looking for can be modelled as consisting of three parties: The trusted \textsc{Transmitter}, one of a large number of untrusted \textsc{Receivers}, and an \textsc{Attacker}. These three play according to the following rules: \begin{enumerate} \item \textsc{Transmitter} and \textsc{Attacker} can both transmit any bit sequence \item \textsc{Receiver} receives any transmission by either \textsc{Transmitter} or \textsc{Attacker} but cannot distinguish between the two on the signal level \item \textsc{Attacker} knows anything a \textsc{Receiver} might know \item \textsc{Transmitter} is stronger than \textsc{Attacker} and will ``win'' in simultaneous transmission \item Both \textsc{Transmitter} and \textsc{Receiver} can be seeded with some information on each other such as public key fingerprints. \end{enumerate} We are not interested in congestion scenarios where an attacker attempts to disrupt an ongoing transmission by the transmitter. In practice there are several avenues to prevent such attempts including the following. Compromised loads that are being abused by the attacker can be manually disconnected by the utility. Error-correcting codes can be used to provide resiliency against small-scale disturbances. Finally, the transmitter can be designed to have high enough power to be able to override any likely attacker. Our goal is to find a cryptographic primitive that has the following properties: \begin{enumerate} \item \textsc{Transmitter} can produce a transmission bit sequence $\mathbf{s}$ (or equivalently a set of such sequences) that \textsc{Receiver} can uniquely identify as being generated by \textsc{Transmitter}: $\mathcal{R}\left(\mathbf{s}\right) = 1$. Upon reception of this sequence, \textsc{Receiver} performs the safety reset. \item \textsc{Attacker} cannot forge $\mathbf{s}$, that is find $\mathbf{s}'$ such that $\mathbf{s} \neq \mathbf{s}' \land \mathcal{R}\left(\mathbf{s}'\right) = 1$ \item Our system conforms to an at-most-once semantic. That is, upon transmission of a valid bit sequence coded for a particular \textsc{Receiver} or set of receivers each one either performs exactly one safety reset or none at all. We cannot achieve an exactly-once semantic since we are using an unidirectional lossy communication primitive. More coloquially, \textsc{Receiver} might be offline due to a localized power outage and might thus not hear \textsc{Transmitter} even if our broadcast primitive is reliable. The practical impact of this limitation can be mitigated by transmitter simply repeating itself until the desired effect has been achieved. \end{enumerate} An important limitation from the rules of our setup above is that \textsc{Attacker} can always record the bit sequence \textsc{Transmitter} transmits and replay that same sequence later. Before considering any cryptographic approaches we can make the preliminary observation that we can trivially prevent \textsc{Attacker} from violating the at-most-once criterion by simply requiring \textsc{Receiver} to memorize all bit sequences that have been transmitted thus far and only reacting to new bit sequences. This means an attacker might be able to cause offline receivers to reset at a later point, but considering our goal is to reset them in the first place this would not pose a danger to the system. % FIXME elaborate why this is not a threat, and possible mitigations As it seems we need a cryptographic primitive that looks somewhat like a signature. Different from a signature however, we have somewhat relaxed constraints here: While cryptographic signatures need to work over arbitrary inputs, all we want to ``sign'' here is the instruction to perform a safety reset. Since this is the only message we might ever want to transmit, our message space has only one entry and thus the informational content of our message is 0 bit! All the information we want to transmit is already encoded \emph{in the fact that we are transmitting}, and we do not require any further payload to be transmitted. This means we can omit the entirety of the message and just transmit whatever ``signature'' we produce. This is useful since we have to conserve transmission bits so our transmissions do not take exceeedingly long time over our extremely slow communication channel. We could use any of several traditional asymmetric cryptographic primitives to produce these signatures. The comparatively high computational effort required for signature verification would not be an issue. Transmissions take several minutes anyway and we can afford to spend some tens of seconds even in signature verification. Transmission length and by proxy system latency would be determined by the length of the signature. For RSA signature length is the modulus length (i.e. larger than 1000 bit for even basic contemporary security). For elliptic curve-based systems signature size is approximately twice the curve length (i.e. ~300 bit for contemporary security). However, we can do better than this: We can exploit the strange nature of our setting that our effective message entropy is 0 bit to derive a more efficient scheme. \subsubsection{Lamport signatures} In 1979, \textcite{lamport02} introduced a signature scheme that is based only on a one-way function such as a cryptographic hash function. The basic observation is that by choosing a random secret input to a one-way function and publishing the output, one can later prove knowledge of the input by simply publishing it. In the following paragraphs we will describe a construction of a one-time signature scheme based on this observation. The scheme we describe is the one usually called a ``Lamport Signature'' in modern literature and is slightly different from the variant described in the 1979 paper, but for our purposes we can consider both to be equivalent. \paragraph{Setup.} In a Lamport signature, for an n-bit hash function $H$ the signer generates a private key $s = \left(s_{b, i} | b\in\left\{0, 1\right\}, 0\le i] (input.south) -- (safety.north); \draw[-] (safety.south) -- (safety-anchor); \draw[->] (safety-anchor) -| (powersupply.north); \draw[->] (safety-anchor) -| (analog.north); \draw[->] (powersupply.south) |- (adc.west); \draw[->] (powersupply.south) |- (micro.west); \draw[->] (analog.south) -- (adc.north); \draw[->] (adc.south) -- (micro.north); \draw[->] (micro.south) -- (isol.north); \draw[->] (isol.south) -- (usb.north); \draw[dashed] (isol.west) -- (isol-left.east); \draw[dashed] (isol.east) -- (isol-right.west); \end{tikzpicture} \end{center} \caption{Frequency sensor hardware diagram} \label{fmeas-sens-diag} \end{figure} An overall block diagram of our system is shown in Figure \ref{fmeas-sens-diag}. The mircrocontroller we chose is an \texttt{STM32F030F4P6} ARM Cortex-M0 microcontroller made by ST Microelectronics. The ADC in Figure \ref{fmeas-sens-diag} in our design is the integrated 12-bit ADC of this microcontroller, which is sufficient for our purposes. The USB interface is a simple USB to serial converter IC (\texttt{CH340G}) and the galvanic digital isolation is accomplished with a pair of high-speed optocouplers on its \texttt{RX} and \texttt{TX} lines. The analog signal processing is a simple voltage divider using high-power resistors to get the required creepage along with some high-frequency filter capacitors and an op-amp buffer. The power supply is an off-the-shelf mains-input power module. The system is implemented on a single two-layer PCB that is housed in an off-the-shelf industrial plastic case fitted with a printed label and a few status lights on its front. \subsection{Clock accuracy considerations} Our measurement hardware will sample line voltage at some sampling rate $f_S$, e.g.\ \SI{1}{\kilo\hertz}. All downstream processsing is limited in accuracy by the accuracy of $f_S$\footnote{ We are not considering the effects of clock jitter. We are highly oversampling the signal and the FFT done in our downstream processing will eliminate small jitter effects leaving only frequency stability to worry about. }. We generate our sampling clock in hardware by clocking the ADC from one of the microcontroller's timer blocks clocked from the microcontroller's system clock. This means our ADC's sampling window will be synchronized cycle-accurate to the microcontroller's system clock. Our downstream measurement of mains frequency by nature is relative to our sampling frequency $f_S$. In the setup described above this means we have to make sure our system clock is fairly stable. A frequency derivation of \SI{1}{ppm} in our system clock causes a proportional grid frequency measurement error of $\Delta f = f_\text{nom} \cdot 10^{-6} = \SI{50}{\micro\hertz}$. In a worst-case where our system is clocked from a particularly bad crystal that exhibits \SI{100}{ppm} of instabilities over our measurement period we end up with an error of \SI{5}{\milli\hertz}. This is well within our target measurement range, so we need a more stable clock source. Ideally we want to avoid writing our own clock conditioning code where we try to change an oscillators operating frequency to match some reference. Clock conditioning algorithms are highly complex and in our case post-processing of measurement data and simply adding and offset is simpler and less error-prone. Our solution to these problems is to use a crystal oven\footnote{ A crystal oven is a crystal oscillator thermally coupled closely to a heater and temperature sensor and enclosed in a thermally isolated case. The heater is controlled to hold the crystal oscillator at a near-constant temperature some few ten degrees above ambient. Any ambient temperature variations will be absorbed by the temperature control. This yields a crystal frequency that is almost completely unaffected by ambient temperature variations below the oven temperature and whose main remaining instability is aging. }as our main system clock source. Crystal ovens are expensive compared to ordinary crystal oscillators. Since any crystal oven will be much more accurate than a standard room-temperature crystal we chose to reduce cost by using one recycled from old telecommunications equipment. To verify clock accuracy we routed an externally accessible SMA connector to a microcontroller pin that is routed to one of the microcontroller's timer inputs. By connecting a GPS 1pps signal to this pin and measuring its period we can calculate our system's Allan variance\footnote{ Allan variance is a measure of frequency stability between two clocks. }, thereby measuring both clock stability and clock accuracy. We ran a 4 hour test of our frequency sensor that generated the histogram shown in figure \ref{ocxo_freq_stability}. These results show that while we get a systematic error of about \SI{10}{ppm} due to manufacturing tolerances the random error at less than \SI{10}{ppb} is smaller than that of a room-temperature crystal oscillator by 3-4 orders of magnitude. Since we are interested in grid frequency variations over time but not in the absolute value of grid frequency the systematic error is of no consequence to us. The random error at \SI{3.66}{ppb} corresponds to a frequency measurement error of about \SI{0.2}{\micro\hertz}, well below what we can achieve at reasonable sampling rates and ADC resolution. \begin{figure} \centering \includegraphics{../lab-windows/fig_out/ocxo_freq_stability} \caption{OCXO Frequency derivation from nominal \SI{19.440}{\mega\hertz} measured against GPS 1pps} \label{ocxo_freq_stability} \end{figure} \subsection{Firmware implementation} The firmware uses one of the microcontroller's timers clocked from an external crystal oscillator to produce an \SI{1}{\milli\second} tick that the internal ADC is triggered from for a sample rate of \SI{1}{\kilo sps}. Higher sample rates would be possible but reliable data transmission over the opto-isolated serial interface might prove challenging and \SI{1}{\kilo sps} corresponds to $20$ samples per cycle at $f_\text{nominal}$. This is $10\times$ nyquist and should be plenty for accurate measurements. The ADC measurements are read using DMA and written into a circular buffer. Using some DMA controller features this circular buffer is split in back and front halves with one being written to and the other being read at the same time. Buffer contents are moved from the ADC DMA buffer into a packet-based reliable UART interface as they come in. The UART packet interface keeps two ringbuffers: One byte-based ringbuffer for transmission data and one ringbuffer pointer structure that keeps track of ADC data packet boundaries in the byte-based ringbuffer. Every time a chunk of data is available from the ADC the data is framed into the byte-based ringbuffer and the packet boundaries are logged in the packet pointer ringbuffer. If the UART transmitter is idle at this time a DMA-backed transmission of the oldest packet in the packet ringbuffer is triggered at this point. Data is framed using Consistent Overhead Byte Stuffing (COBS)\footnote{ COBS is a framing technique that allows encoding $n$ bytes of arbitray data into exactly $n+1$ bytes with no embedded $0$-bytes that can then be delimited using $0$-bytes. COBS is simple to implement and allows both one-pass decoding and encoding. The encoder either needs to be able to read up to \SI{256}{\byte} ahead or needs a buffer of \SI{256}{\byte}. COBS is very robust in that it allows self-synchronization. At any point a receiver can reliably synchronize itself against a COBS data stream by waiting for the next $0$-byte. The constant overhead allows precise bandwidth and buffer planning and provides constant, good efficiency close to the theoretical maximum.}\cite{cheshire01} along with a CRC-32 checksum for error checking. When the host receives a new packet with a valid checksum it returns an acknowledgement packet to the sensor. When the sensor receives the acknowledgement, the acknowledged packet is dropped from the transmission packet ringbuffer. When the host detects an incorrect checksum it simply stays quiet and waits for the sensor to resume with retransmission when the next ADC buffer has been received. The serial interface logic presents most of the complexity of the sensor firmware. This complexity is necessary since we need reliable, error-checked transmission to the host. Though rare, bit errors on a serial interface do happen and data corruption is unacceptable. The packet-layer queueing on the sensor is necessary since the host is not a realtime system and unpredictable latency spikes of several hundred milliseconds are possible. The host in our recording setup is a Raspberry Pi 3 model B running a Python script. The Python script handles serial communication and logs data and errors into an SQLite database file. SQLite has been chosen for its simple yet flexible interface and its good tolerance of system resets due to unexpected power loss. Overall our setup performed adequately with IO contention on the raspberry PI/linux side causing only 16 skipped sample packets over a 68-hour recording span. \subsection{Frequency sensor measurement results} Captured raw waveform data has been processed in the Jupyter Lab environment\cite{kluyver01} and grid frequency estimates are extracted as described in sec. \ref{frequency_estimation} using the \textcite{gasior01} technique. Appendix \ref{grid_freq_estimation_notebook} contains the Jupyter notebook we used for frequency measurement. In Figure \ref{freq_meas_feedback} we fed back to the frequency estimator its own output giving us an indication of its numerical performance. The result was \SI{1.3}{\milli\hertz} of RMS noise over a \SI{3600}{\second} simulation time. This indicates performance is good enough for our purposes. In addition to this we validated our algorithm's performance by applying it to the test waveforms from \textcite{wright01}. In this test we got errors of \SI{4.4}{\milli\hertz} for the \emph{noise} test waveform, \SI{0.027}{\milli\hertz} for the \emph{interharmonics} test waveform and \SI{46}{\milli\hertz} for the \emph{amplitude and phase step} test waveform. Full results can be found in Figure \ref{freq_meas_rocof_reference}. Figures \ref{freq_meas_trace} and \ref{freq_meas_trace_mag} show our measurement results over a 24-hour and a 2-hour window respectively. \begin{figure} \centering \includegraphics[width=\textwidth]{../lab-windows/fig_out/freq_meas_feedback} \caption{ The frequency estimation algorithm applied to a synthetic noise-less mains waveform generated from its own output. This feedback simulation gives an indication of numerical errors in our estimation algorithm. The top four graphs show a comparison of the original trace (blue) and the re-calculated trace (orange). The bottom trace shows the difference between the two. As we can tell both traces agree very well with an overall RMS deviation of about \SI{1.3}{\milli\hertz}. The bottom trace shows deviation growing over time. This is very likely an effect of numerical errors in our ad-hoc waveform generator. } \label{freq_meas_feedback} \end{figure} \begin{figure} \centering \includegraphics[width=\textwidth]{../lab-windows/fig_out/freq_meas_rocof_reference} \caption{ Performance of our frequency estimation algorithm against the test suite specified in \textcite{wright01}. Shown are standard deviation and variance measurements as well as time-domain traces of differences. } \label{freq_meas_rocof_reference} \end{figure} \begin{figure} \centering \includegraphics{../lab-windows/fig_out/freq_meas_trace_24h} \caption{Trace of grid frequency over a 24 hour window. One clearly visible feature are large positive and negative transients at full hours. Times shown are UTC. Note that the european continental synchronous area that this sensor is placed in covers several time zones which may result in images of daily load peaks appearing in 1 hour intervals. Figure \ref{freq_meas_trace_mag} contains two magnified intervals from this plot.} \label{freq_meas_trace} \end{figure} \begin{figure} \begin{subfigure}{\textwidth} \centering \includegraphics{../lab-windows/fig_out/freq_meas_trace_2h_1} \caption{A 2 hour window around 00:00 UTC.} \end{subfigure} \begin{subfigure}{\textwidth} \centering \includegraphics{../lab-windows/fig_out/freq_meas_trace_2h_2} \caption{A 2 hour window around 18:30 UTC.} \end{subfigure} \caption{Two magnified 2 hour windows of the trace from Figure \ref{freq_meas_trace}.} \label{freq_meas_trace_mag} \end{figure} \begin{figure} \centering \includegraphics{../lab-windows/fig_out/mains_voltage_spectrum} \caption{Power spectral density of the mains voltage trace in Figure \ref{freq_meas_trace}. Data was captured using our frequency measurement sensor (\ref{sec-fsensor}) and FFT'ed after applying a blackman window. Vertical lines indicate \SI{50}{\hertz} and odd harmonics. We can see the expected peak at \SI{50}{\hertz} along with smaller peaks at odd harmonics. We can also see a number of spurious tones both between harmonics and at low frequencies, as well as some bands containing high noise energy around \SI{0.1}{\hertz}. This graph demonstrates a high signal-to-noise ratio that is not very demanding on our frequency estimation algorithm. } \label{mains_voltage_spectrum} \end{figure} \section{Channel simulation and parameter validation} \label{sec-ch-sim} To validate all layers of our communication stack from modulation scheme to cryptography we built a prototype implementation in python. Implementing all components in a high-level language builds up familiartiy with the concepts while taking away much of the implementation complexity. For our demonstrator we will not be able to use python since our target platform is a cheap low-end microcontroller. Our demonstrator firmware will have to be written in a low-level language such as C or rust. For prototyping these languages lack flexibility compared to python. % FIXME introduce project outline, specs -> proto -> demo above! To validate our modulation scheme we first performed a series of simulations on our python demodulator prototype implementation. To simulate a modulated grid frequency signal we added noise to a synthetic modulation signal. For most simulations we used measured frequency data gathered with our frequency sensor. We only have a limited amount of capture data. Re-using segements of this data as background noise in multiple simulation runs could hypothetically lead to our simulation results depending on individual features of this particular capture that would be common between all runs. To estimate the impact of this problem we re-ran some of our simulations with artificial random noise synthesized with a power spectral density matching that of our capture. To do this, we first measured our capture's PSD, then fitted a low-resolution spline to the PSD curve in log-log coördinates. We then generated white noise, multiplied the resampled spline with the DFT of the synthetic noise and performed an iDFT on the result. The resulting time-domain signal is our synthetic grid frequency data. Figure \ref{freq_meas_spectrum} shows the PSD of our measured grid frequency signal. The red line indicates the low-resolution log-log spline interpolation used for shaping our artificial noise. Figure \ref{simulated_noise_spectrum} shows the PSD of our simulated signal overlayed with the same spline as a red line and shows time-domain traces of both simulated (blue) and reference signals (orange) at various time scales. Visually both signals look very similar, suggesting we have found a good synthetic approximation of our measurements. \begin{figure} \centering \includegraphics[width=\textwidth]{../lab-windows/fig_out/freq_meas_spectrum} \caption{Power spectral density of the 24 hour grid frequency trace in Figure \ref{freq_meas_trace} with some notable peaks annotated with the corresponding period in seconds. The $\frac{1}{f}$ line indicates a pink noise spectrum. Around a period of \SI{20}{\second} the PSD starts to fall off at about $\frac{1}{f^3}$ until we can make out some bumps at periods around $2$ and \SI{3}{\second}. Starting at at around \SI{1}{Hz} we can see a white noise floor in the order of \si{\micro\hertz^2\per\hertz}. % TODO: where does this noise floor come from? Is it a fundamental property of the grid? Is it due to limitations of % our measurement setup (such as ocxo stability/phase noise) ??? } \label{freq_meas_spectrum} \end{figure} \begin{figure} \centering \includegraphics[width=\textwidth]{../lab-windows/fig_out/simulated_noise_spectrum} \caption{Synthetic grid frequency in comparison with measured data. The topmost graph shows the synthetic spectrum compared to the spline approximation of the measured spectrum (red line). The other graphs show time-domain synthetic data (blue) in comparison with measured data (orange). } \label{simulated_noise_spectrum} \end{figure} In our simulations, we manipulated four main variables of our modulation scheme and demodulation algorithm and observed their impact on symbol error rate (SER): \begin{description} \item[Modulation amplitude.] Higher amplitude should correspond to a lower SER. \item[Modulation bit count.] Higher bit count $n$ means longer transmissions but yields higher theoretical decoding gain, and should increase demodulator sensitivity. Ultimately, we want to find a sweet spot of manageable transmission length at good demodulator sensitivity. \item[Decimation.] or DSSS chip duration. The chip time determines where in the grid frequency spectrum (Figure \ref{freq_meas_spectrum} our modulated signal is located. Given our noise spectrum (Figure \ref{freq_meas_spectrum}) lower chip durations (shifting our signal upwards in the spectrum) should yield lower in-band background noise which should correspond to lower symbol error rates. \item[Demodulation correlator peak threshold factor.] The first step of our prototype demodulation algorithm is to calculate the correlation between all $2^n+1$ Gold sequences and to identify peaks corresponding to the input data containing a correctly aligned Gold sequence. The threshold factor is a factor peaks of what magnitude compared to baseline noise levels are considered in the following maximum likelihood estimation (MLE) decoding (cf.\ Figure \ref{fig_demo_sig_schema}). \end{description} Our results indicate that symbol error rate is a good proxy of demodulation performance. With decreasing signal-to-noise ratio, margins in various parts of the demodulator decrease which statistically leads to an increased symbol error rate. Our simulations yield smooth, reproducible SER curves with adequately low error bounds. This shows SER is related monotonically to the signal-to-noise margins inside our demodulator prototype. \subsection{Sensitivity as a function of sequency length} A basic parameter of our DSSS modulation is the length of the Gold codes used. The length of a Gold code is exponential in the code's bit count. Figure \ref{dsss_gold_nbits_overview} shows a plot of the symbol error rate of our demodulator prototype depending on amplitude for each of five, six, seven and eigth-bit Gold sequences. In regions where symbol error rate is between $0$ and $1$ we can see the expected dependency that a $n+1$ bit Gold sequence at roughly twice the length yields roughly one half the SER. We can also observe a saturation effect: At low amplitudes, increasing the correlation length does not seem to yield much of a benefit in SER anymore. In particular there seems to be a level of about \SI{2.5}{\milli\hertz} signal amplitude where even with asymptotically infinite sequence length our demodulator would still not be able to produce a good demodulation. This is likely due to numerical errors in our demodulator. Since Gold codes of more than 7 bit would yield unacceptably long transmission times this does not pose a problem in practice. Figure \ref{dsss_gold_nbits_sensitivity} for each bit count shows the minimum signal amplitude where our demodulator crossed below $\text{SER}=0.5$. If we have sufficient transmitter power to allocate selecting either a 5 bit or a 6 bit gold code looks to yield good enough performance at manageable data rates. \begin{figure} \centering \includegraphics{../lab-windows/fig_out/dsss_gold_nbits_overview} \caption{ Symbol Error Rate (SER) as a function of transmission amplitude. The line represents the mean of several measurements for each parameter set. The shaded areas indicate one standard deviation from the mean. Background noise for each trial is a random segment of measured grid frequency. Background noise amplitude is the same for all trials. Shown are four traces for four different DSSS sequence lengths. Using a 5-bit gold code, one DSSS symbol measures 31 chips. 6 bit per symbol are 63 chips, 7 bit are 127 chips and 8 bit 255 chips. This simulation uses a decimation of 10, which corresponds to an $1 \text{s}$ chip length at our $10 \text{Hz}$ grid frequency sampling rate. At 5 bit per symbol, one symbol takes $31 \text{s}$ and one bit takes $6.2 \text{s}$ amortized. At 8 bit one symbol takes $255 \text{s} = 4 \text{min} 15 \text{s}$ and one bit takes $31.9 \text{s}$ amortized. Here, slower transmission speed buys coding gain. All else being the same this allows for a decrease in transmission power. } \label{dsss_gold_nbits_overview} \end{figure} \begin{figure} \centering \includegraphics{../lab-windows/fig_out/dsss_gold_nbits_sensitivity} \caption{ Amplitude at a SER of 0.5\ in mHz depending on symbol length. Here we can observe an increase of sensitivity with increasing symbol length, but we can clearly see diminishing returns above 6 bit (63 chips). Considering that each bit roughly doubles overall transmission time for a given data length it seems lower bit counts are preferrable if the necessary transmitter power can be realized. } \label{dsss_gold_nbits_sensitivity} \end{figure} \subsection{Sensitivity versus peak detection threshold factor} One of the high-level parameters of our demodulation algorithm is the \emph{threshold factor}. This parameter is an implementation detail specific to our algorithm and not general to all possible DSSS demodulation algorithms. After correlating the input signal against the template Gold sequences our algorithm runs a single-channel discrete wavelet transform (DWT) on the correlator output to better discriminate peaks from background noise. The output of this DWT is then normalized against a running average and then fed into a simple threshold detector. The threshold of this detector is our threshold factor. This threshold is the ratio that a correlation peak after DWT has to stand out from long-term average background noise to be considered a peak. The threshold factor is an empirically-determined parameter Low threshold factors yield many false positives that in the extreme ultimately overload our MLE estimator's capacity to discard them. Moderate numbers of false positive do not pose much of a challenge to our MLE since these spurious peaks have a random time distribution and are easily discarded by our MLE's symbol chain detection. High threshold factors lead the algorithm to completely ignore some valid peaks. To some degree this can be compensated by our later interpolation step for missing peaks but in the extreme will also break demodulation. In our simulations good values lie in the range from $4.0$ to $5.5$. Figure \ref{dsss_thf_amplitude_5678} contains plots of demodulator sensitivity like the one in Figure \ref{dsss_gold_nbits_overview}. This time there is one color-coded trace for each threshold factor between $1.5$ and $10.0$ in steps of $0.5$. We can see a clear dependency of demodulation performance from trheshold factor with both very low and very high values breaking the demodulator. The ``runaway'' traces that we can see at low threshold factors are artifacts of an implementation issue with our prototype code. We later fixed this issue in the demonstrator firmware implementation in Section \ref{sec-demo-fw-impl}. For comparison purposes this issue do not matter. \begin{figure} \centering \includegraphics{../lab-windows/fig_out/dsss_thf_amplitude_5678} \caption{ SER vs.\ amplitude graph similar to Figure \ref{dsss_gold_nbits_overview} with one color-coded traces for threshold factors between $1.5$ and $10.0$. Each graph shows traces for a single DSSS symbol length. } \label{dsss_thf_amplitude_5678} \end{figure} If we again look at the intercept points where the amplitude traces cross $\text{SER}=0.5$ in these graphs we get the plots in Figure \ref{dsss_thf_sensitivity_all_bits}. From this we can conclude that the range between $4.0$ and $5.0$ will yield adequate threshold factors for our use case. \begin{figure} \centering \includegraphics{../lab-windows/fig_out/dsss_thf_sensitivity_5678} \caption{ Graphs of amplitude at $SER=0.5$ for each symbol length as well as asymptotic SER for large amplitudes. Areas shaded red indicate that $SER=0.5$ was not reached for any amplitude in the simulated range. The bumps in the 7 bit and 8 bit graphs are due to the convergence problem we identified above and do not exist in our demonstrator implementation. We see that smaller symbol lengths favor lower threshold factors, and that optimal threshold factors for all symbol lengths are between $4.0$ and $5.0$. } \label{dsss_thf_sensitivity_all_bits} \end{figure} \subsection{Chip duration and bandwidth} A parameter of any DSSS system is the frequency band used for transmission. Instead of specifying absolute frequencies in our simulations we expressed DSSS bandwidth through chip duration and Gold sequence length. In our prototype, chip duration is specified in grid frequency sampling periods to ease implementation without loss of generalization. Figure \ref{chip_duration_sensitivity} shows the dependence of symbol error rate at a fixed good threshold factor from chip duration. The color bars indicate both chip duration translated to seconds real-time and the resulting symbol duration at the given Gold code length. In the lower graphs we show the trace of ampltude at $\text{SER}=0.5$ over chip duration like we did in Figure \ref{dsss_thf_sensitivity_all_bits} for threshold facotr. In both graphs we can just about see an optimum for very short chips with a decrease of sensitivity for long chips. This effect is due to longer chips moving the signal band into noisier spectral regions (cf.\ Figure \ref{freq_meas_spectrum}). \begin{figure} \begin{subfigure}{\textwidth} \centering \includegraphics[width=\textwidth]{../lab-windows/fig_out/chip_duration_sensitivity_5} \label{chip_duration_sensitivity_5} \caption{ 5 bit Gold code } \end{subfigure} \end{figure} \begin{figure} \ContinuedFloat \begin{subfigure}{\textwidth} \centering \includegraphics[width=\textwidth]{../lab-windows/fig_out/chip_duration_sensitivity_6} \label{chip_duration_sensitivity_6} \caption{ 6 bit Gold code } \end{subfigure} \caption{ Dependence of demodulator sensitivity on DSSS chip duration. Due to computational constraints this simulation is limited to 5 bit and 6 bit DSSS sequences. There is a clearly visible sensitivity maximum at fairly short chip lengths around $0.2 \text{s}$. Short chip durations shift the entire transmission band up in frequency. In Figure \ref{freq_meas_spectrum} we can see that noise energy is mostly concentrated at lower frequencies, so shifting our signal up in frequency will reduce the amount of noise the decoder sees behind the correlator by shifting the band of interest into a lower-noise spectral region. For a practical implementation chip duration is limited by physical factors such as the maximum modulation slew rate ($\frac{\text{d}P}{\text{d}t}$) and the maximum Rate-Of-Change-Of-Frequency (ROCOF, $\frac{\text{d}f}{\text{d}t}$) the grid can tolerate. } \label{chip_duration_sensitivity} \end{figure} In the previous graphs we have used random clips of measured grid frequency noise as noise in our simulations. Comparing between a simulation using measured noise and synthetic noise generated as we outlined in the beginning of Section \label{sec-ch-sim} we get the plots in Figure \ref{chip_duration_sensitivity_cmp}. We can see that while not perfect our simulated noise is an adequate approximation of reality: Our prototype demodulator shows no significant difference in behavior between measured and simulated noise. Simulated noise causes slightly worse performance for long chips. Overall the results for both are very close in absolute value. \begin{figure} \begin{subfigure}{\textwidth} \centering \includegraphics[width=\textwidth]{../lab-windows/fig_out/chip_duration_sensitivity_cmp_meas_6} \label{chip_duration_sensitivity_cmp_meas_6} \caption{ Simulation using baseline frequency data from actual measurements. } \end{subfigure} \end{figure} \begin{figure} \ContinuedFloat \begin{subfigure}{\textwidth} \centering \includegraphics[width=\textwidth]{../lab-windows/fig_out/chip_duration_sensitivity_cmp_synth_6} \label{chip_duration_sensitivity_cmp_synth_6} \caption{ Simulation using synthetic frequency data. } \end{subfigure} \caption{ Chip duration/sensitivity simulation results like in Figure \ref{chip_duration_sensitivity} compared between a simulation using measured frequency data like previous graphs and one using artificially generated noise. There is little visible difference indicating that we have found a good model of reality in our noise synthesizer, but also that real grid frequency behaves like a frequency-shaped gaussian noise process. } \label{chip_duration_sensitivity_cmp} \end{figure} \section{Implementation of a demonstrator unit} To demonstrate the viability of our reset architecture we decided to implement a demonstrator system. In this demonstrator we use JTAG to reset part of a commodity smart meter from an externally-connected reset controller. The reset controller receives its commands over the grid frequency modulation system we outlined in this thesis. To keep implementation cost low the reset controller is fed a simulation of a modulated grid frequency signal through a standard \SI{3.5}{\milli\meter} audio jack\footnote{ By generously cutting two PCB traces the meter we chose to use can be easily modified to provide strong galvanic separation between grid and main application microcontroller. With this modification we have to supply power to its main application MCU externally along with the JTAG interface. }. Measurement of actual grid frequency instead would simply require a voltage divider and depending on the setup an analog optoisolator. \subsection{Selecting a smart meter for demonstration purposes} \label{sec-easymeter} For our demonstrator to make sense we wanted to select a realistic reset target. In Germany where this thesis was written a standards-compliant setup would consist of a fairly dumb smart meter and a smart meter gateway (SMGW) containing all of the complex bidirectional protocol logic such as wireless or landline IP connectivity. The realistic target for a setup in this architecture would be the components of an SMGW such as its communications modem or main application processor. In the German architecture the smart meter does not even have to have a bi-directional data link to the SMGW effectively mitigating any attack vector for remote compormise. Despite these considerations we still chose to reset the application MCU inside smart meter for two reasons. One is that SMGWs are much harder to come by on the second-hand market. The other is that SMGWs are a particular feature of the German standardization landscape and in many other countries functions of an SMGW such as wireless protocol handling are integrated into the meter itself (see e.g.\ \cite{honeywell01}). In the end we settled on an Q3DA1002 three-phase 60A meter made by German manufacturer EasyMeter. This meter is typical of what would be found in an average German household and can be acquired very inexpensively as new old stock on online marketplaces. The meter consists of a plastic enclosure with a transparent polycarbonate top part and a grey ABS bottom part that are ultrasonically welded shut. In the bottom part of the case a PCB we call the \emph{measurement} board is potted in epoxide resin (see Figure \ref{easymeter_composites}). This PCB contains three separate energy measurement ASICs for the three phases (see Figure \ref{easymeter_detail_xrays}). It also contains a capacitive dropper power supply for the meter circuitry and external modules such as a SMGW. The measurement board through three infrared links (one per phase) communicates with a smaller unpotted PCB we call the \emph{display} board in the top of the case. This PCB handles measurement logging and aggregation, controls a small segment LCD displaying totals and handles the externally accessible \si{\kilo\watt\hour} impulse LED and serial IR links. The measurement board does not contain any logging or outside communication interfaces. All of that is handled on the display board by a Texas Instruments MSP430F2350 application MCU. This is a 16-bit RISC MCU with \SI{16}{\kilo\byte} flash and \SI{2}{\kilo\byte} SRAM\footnote{ The microcontroller might seem a bit overkill for such a simple application, but most of its \SI{16}{\kilo\byte} program flash is in fact used. A casual glance with Ghidra shows that a large part of program flash is expended on keeping multiple redundant copies of energy consumption aggregates including error recovery in case of data corruption and some effort has even been made to guard against data corruption using simple non-cryptographic checksums. Another large part of the MCU's firmware handles data transmission over the meter's externally accessible IR link through Smart Message Language\cite{bsi-tr-03109-1-IVb}. }. There is an I2C EEPROM that is used in conjunction with the microcontroller's internal \SI{256}{\byte} data flash to keep redundant copies of energy consumption aggregates. On the side of the base board is a 14-pin header containing both a standard TI MSP430 JTAG pinout and an UART serial link for debugging. Conveniently the JTAG port was left enabled by fuse in our particular production unit. We chose to use this MSP430 series application MCU as our reset target. Though in this particular unit compromise is impossible due to a lack of bi-directional communication links some of its sister models do contain bidirectional communication links\cite{easymeter01} making compromise through communication interfaces at least a theoretical possibility. In other countries meters with a similar architecture to the Q3DA1002 commonly include complex protocol logic as part of the meter itself\cite{honeywell01,ifixit01}. As an example, the Honeywell REX2 uses a Maxim Integrated 71M6541 main application microcontroller along with a Texas Instruments CC1000 series radio transceiver and is advertised to support both over-the-air firmware upgrades and a remotely accessible ``service control switch''. % TODO add pics of the intact easymeter and of the one with the safety reset0r hooked up \begin{figure} \centering \begin{subfigure}{\textwidth} \centering \includegraphics[width=0.6\textwidth]{resources/easymeter_board_composite.jpg} \label{easymeter_display_board_composite} \caption{ \footnotesize Optical composite image of the display and data logging board in the top of the case. The six pins at the top are the SPI chip-on-glass segment LCD. Of the eight pads on the left six are unused and two carry the auxiliary power supply from the measurement board below. The bottom right section contains the \si{\kilo\watt\hour} impulse LED and the angled IR communication LED. The flying wires connect to the 14-pin JTAG and serial debug header. } \end{subfigure} \begin{subfigure}{\textwidth} \vspace{1cm} \centering \includegraphics[width=0.8\textwidth]{resources/easymeter_baseboard_composite.jpg} \label{easymeter_measurement_board_composite} \caption{ \footnotesize Composite microfocus x-ray image of the potted measurement module in the bottom of the case. The ovals on the top left and right are power supply and data jumper connections for external modules such as SMGW interfaces. The bright parts at the bottom are the massive screw terminals with integrated current shunts. The circuitry right of the three independent measurement channels is the power supply circuit for the display board. } \end{subfigure} \caption{ Composite images of the circuit boards inside the EasyMeter Q3DA1002 ``smart'' electricity meter used in our demonstration. } \label{easymeter_composites} \end{figure} \begin{figure} \centering \begin{subfigure}{0.45\textwidth} \centering \includegraphics[width=\textwidth]{resources/easymeter_baseboard_channel.jpg} \label{easymeter_channel_xray} \caption{Microfocus x-ray of one channel's data acquisition circuit} \end{subfigure}\hspace*{5mm} \begin{subfigure}{0.45\textwidth} \centering \includegraphics[width=\textwidth]{resources/easymeter_baseboard_powersupply.jpg} \label{easymeter_powersupply_xray} \caption{Microfocus x-ray of the auxiliary power supply} \end{subfigure} \caption{ Microfocus x-rays of major sections of the EasyMeter Q3DA1002 measurement board } \label{easymeter_detail_xrays} \end{figure} \subsection{Firmware implementation} \label{sec-demo-fw-impl} We based our safety reset demonstrator firmware on the grid frequency sensor firmware we developed in sec.\ \ref{sec-fsensor}. We implemented DSSS demodulation by translating the python prototype code we developed in sec.\ \ref{sec-ch-sim} to embedded C code. After validating the C translation in extensive simulations we integrated our code with a reed-solomon implementation and a libsodium-based implementation of the cryptographic protocol we designed in sec.\ \ref{sec-crypto}. To reprogram the target MSP430 microcontroller we ported over the low-level bitbang JTAG driver of mspdebug\footnote{\url{https://github.com/dlbeer/mspdebug}}. See Figure \ref{fig_demo_sig_schema} for a schematic overview of signal processing in our demonstrator. For all computation-heavy high-level modules of our firmware such as the DSSS demodulator or the grid frequency estimator we wrote test fixtures that allow the same code that runs on the microcontroller to be executed on the host for testing. These test fixtures are very simple C programs that load input data from a file or the command line, run the algorithm and print results on standard output. \begin{figure} \centering \includegraphics[width=\textwidth]{resources/prototype_schema} \caption{The signal processing chain of our demonstrator.} \label{fig_demo_sig_schema} \end{figure} \section{Grid frequency modulation emulation} To emulate a modulated grid frequency signal we superimposed a DSSS-modulated signal at the proper amplitude with synthetic grid frequency noise generated according to the measurements we took in sec. \ref{sec-fsensor}. In this primitive simulation we do not simulate the precise impulse response of the grid to a DSSS-modulated stimulus signal. Our results still serve to illustrate the possibility of data transmission in this manner this impulse response can be compensated for at the transmitter by selecting appropriate modulation parameters (e.g. chip rate and amplitude) and at the receiver by equalization with a matched filter. \section{Experimental results} After extensive simulations and testing of the individual modules of our solution we proceeded to conduct a real-world experiment. We tried the demonstrator setup with an emulated noisy DSSS signal in real-time. Our experiment went without any issues and the firmware implementation correctly reset the demonstrator's meter. We were happy to see that our extensive testing paid off: The demonstrator setup worked on its first try. % FIXME add pictures of the finished demo setup in action % FIXME maybe add an SER curve here? \section{Lessons learned} Before settling on the commercial smart meter we first tried to use an EVM430-F6779 smart meter evaluation kit made by Texas Instruments. This evaluation kit did not turn out well for two main reasons. One, it shipped with half the case missing and no cover for the terminal blocks. Because of this some work was required to maintain electrical safety. Even after mounting it in an electrically safe manner since the main MCU is not isolated from the grid and the JTAG port is also galvanically coupled the safety reset controller prototype would also have to be galvanically isolated to not pose an electrical safety risk. The second issue we ran into was that the EVM430-F6779 is based around an MSP430F6779 microcontroller. This microcontroller is a rather large part within the MSP430 series and uses a particularly new revision of the CPU core and associated JTAG peripheral that are incompatible with all MSP430 programmers we tried to use on it. mspdebug does not have support for it and porting TI's own JTAG programmer reference sources did not yield any results either. Finally we tried an USB-based programmer made by TI themselves that turned out to either have broken firmware or a hardware defect, leading to it frequently re-enumerating on the USB. Overall our initial assumption that a development kit would certainly be easier to program than a commercial meter did not prove to be true. Contrary to our expectations the commercial meter had JTAG enabled allowing us to easily read out its stock firmware without needing to reverse-engineer vendor firmware update files or circumventing code protection measures. The fact that its firmware was only available in its compiled binary form was not much of a hindrance as it proved not to be too complex and all we wanted to know could be found out with just a few hours of digging in Ghidra. In the firmware development phase our approach of testing every module individually (e.g. DSSS demodulator, Reed-Solomon decoder, grid frequency estimation) proved to be very useful. In particular debugging benefited greatly from being able to run a couple thousand tests within seconds. In case of our DSSS demodulator this modular testing and simulation architecture allowed us to simulate many thousand runs of our implementation on test data and directly compare it to our Jupyter/Python prototype (see Figure \ref{fw_proto_comparison}). Since we spent more time polishing our embedded C implementation it turned out to perform much better than our initial python prototype. At the same time it shows fundamentally similar response to its parameters. One significant bug we fixed in the embedded C version is the python version's tendency towards incorrect decodings at even very large amplitudes. \begin{figure} \centering \begin{subfigure}{\textwidth} \centering \includegraphics[trim={0 4cm 0 0},clip]{../lab-windows/fig_out/dsss_thf_amplitude_56_jupyter_impl} \caption{Python prototype} \end{subfigure} \begin{subfigure}{\textwidth} \centering \includegraphics[trim={0 4cm 0 0},clip]{../lab-windows/fig_out/dsss_thf_amplitude_56_fw_impl} \caption{Embedded C implementation} \end{subfigure} \caption{ Symbol error rate plots versus threshold factor for both our python prototype (above) and our firmware implementation of our demodulation algorithm. Note the slightly different threshold factor color scales. Cf.\ Figure \ref{dsss_thf_amplitude_5678}. } \label{fw_proto_comparison} \end{figure} In accordance with our initial estimations we did not run into any code space nor computation bottlenecks for chosing floating-point emulation instead of porting over our algorithms to fixed-point calculations. The extremely slow sampling rate of our systems makes even heavyweight processing such as FFT or our rather brute-force dynamic programming approach to DSSS demodulation possible well within performance constraints. Compiled code size of our firmware implementation is slightly larger than we would like at around \SI{64}{\kilo\byte} for our firmware image including everything except the target microcontroller firmware image. See appendix \ref{symbol_size_chart} for a graph illustrating the contribution of various parts of the signal processing toolchain to this total. Overall the most heavy-weight operations by far are the SHA512 implementation from libsodium and the FFT from ARM's CMSIS signal processing library. \chapter{Future work} \section{Precise grid characterization} We based our simulations on a linear relationship between generation/consumption power imbalance and grid frequency. Our literature study suggests that this is an appropriate first-order approximation\cite{crastan03}. We kept modulation bandwidth in our simulations inside a \SIrange{1000}{100}{\milli\hertz} frequency band that we reason is most likely to exibit this linear behavior in practice. At lower frequencies primary control kicks in. With the frequency delta thresholds specified for primary control systems\cite{entsoe04} this will likely lead to significant non-linear effects. At higher frequencies grid frequency estimation at the receiver becomes more complex. Higher frequencies also come close to modes of mechanical oscillation in generators (usually at \SI{5}{\hertz} and above\cite{crastan03}). An analysis of the above concerns can be performed using dynamic grid simulation models\cite{semerow01,entsoe05}. Presumably out of safety concerns these models are only available under non-disclosure agreements. Integrating NDA-encumbered results stemming from such a model in an open-source publication such as this one poses a logistical challenge which is why we decided to leave this topic for a separate future work. After detailed model simulation we ultimately aim to validate our results experimentally. Assuming linear grid behavior even under very small disturbances a small-scale experiment is an option. Such a small-scale experiment would require very long integration times. Given a frequency characteristic of \SI{30}{\giga\watt\per\hertz} a stimulus of \SI{10}{\kilo\watt} yields $\Delta f = \SI{0.33}{\micro\hertz}$. At an estimated \SI{20}{\milli\hertz} of RMS noise over a bandwidth of interest this results in an SNR slightly better than \SI{-50}{\decibel}. The correlation time necessary to offset this with DSSS processing gain at a chip rate of \SI{1}{\baud} would be in the order of days. With such long correlation times clock stability starts to become a problem as during correlation transmitter and receiver must maintain close phase alignment w.r.t.\ one chip period. A $\leq \SI{10}{\degree}$ phase difference requirement over this period of time would translate into clock stability better than \SI{10}{ppm}. Though certainly not impossible to achieve this does pose an engineering challenge. A possible way to maintain clock alignment is to use grid frequency itself as a reference. Instead of keying the DSSS modulator/demodulator on a local crystal oscillator, chip timings would be described in fractions of a mains voltage cycle. This would track grid frequency variations synchronously at both ends and would maintain phase alignment even over long periods of time at cost of a slight increase in system complexity. \section{Technical standardization} The description of a safety reset system provided in this work could be translated into a formalized technical standard with relatively low effort. Our system is very simple compared to e.g. a full smart meter communication standard and thus can conceivably be described in a single, concise document. The much more complicated side of standardization would be the standardization of the backend operation including key management, coördination and command authorization. \section{Regulatory adoption} Since the proposed system adds significant cost and development overhead at no immediate benefit to either consumer or utility company it is unlikely that it would be adopted voluntarily. Market forces limit what long-term planning utility companies can do. An advanced mitigation such as this one might be out of their reach on their own and might require regulatory intervention to be implemented. To regulatory authorities a system such as this one provides a primitive to guard against attacks. Due to the low-level approach our system might allow a regulatory authority to restore meters to a safe state without the need of fine-grained control of implementation details such as application network protocols. A regulatory authority might specify that all smart meters must use a standardized reset controller that on command resets to a minimal firmware image that disables external communication, continues basic billing functions and enables any disconnect switches. This system would enable the \emph{reset authority} to directly preempt a large-scale attack irrespective of implementation details of the various smart meter implementations. Cryptographic key management for the smart reset system is not much different to the management of highly privileged signing keys as they are used in many other systems already. If the safety reset system is implemented with a regulatory authority as the \emph{reset authority} they would likely be able to find a public entity that is already managing root keys for other government systems to also manage safety reset keys. Availability and security requirements of safety reset keys do not differ significantly from those for other types of root keys. \section{Zones of trust} In our design, we opted for a safety reset controller in form of a separate micocontroller entirely separate from whatever application microcontroller the smart meter design is already using. This design nicely separates the meter into an untrusted application (the core microcontroller) and the trusted reset controller. Since the interface between the two is simple and logically one-way, it can be validated to a high standard of security. Despite these security benefits, the cost of such a separate hardware device might prove high in a mass-market rollout. In this case, one might attempt to integrate the reset controller into the core microcontroller in some way. Primarily, there would be two ways to accomplish this. One is a solution that physically integrates an additional microcontroller core into the main application microcontroller package either as a submodule on the same die or as a separate die in a multi-chip module (MCM) with the main application microcontroller. A full-custom solution integrating both on a single die might be a viable path for very large-scale deployments, but will most likely be too expensive in tooling costs alone to justify its use. More likely for a medium- to large-scale deployment (millions of meters) would be a MCM integrating an off-the-shelf smart metering microcontroller die with the reset controller running on another, much smaller off-the-shelf microcontroller die. This solution might potentially save some cost compared to a solution using a discrete microcontroller for the reset controller. The more likely approach to reducing cost overhead of the reset controller would be to employ virtualization technologies such as ARM's TrustZone in order to incorporate the reset controller firmware into the application firmware on the same processor core without compromising the reset controller's security or disturbing the application firmware's operation. TrustZone is a virtualization technology that provides a hardware-assisted privileged execution domain on at least one of the microcontroller's cores. In traditional virtualization setups a privileged hypervisor is managing several unprivileged applications sharing resources between them. Separation between applications in this setup is longitudinal between adjacent virtual machines. Two applications would both be running in unprivileged mode sharing the same cpu and the hypervisor would merely schedule them, configure hardware resource access and coördinate communication. This longitudinal virtualization simplifies application development since from the application's perspective the virtual machine looks very similar to a physical one. In addition, in general this setup reciprocally isolates two applications with neither one being able to gain control over the other. In contrast to this, a TrustZone-like system in general does not provide several application virtual machines and longitudinal separation. Instead, it provides lateral separation between two domains: The unprivileged application firmware and a privileged hypervisor. Application firmware may communicate with the hypervisor through defined interfaces but due to TrustZone's design it need not even be aware of the hypervisor's existence. This makes a perfect fit for our reset controller. The reset controller firmware would be running in privileged mode and without exposing any communication interfaces to application firmware. The application firmware would be running in unprivileged mode without any modification. The main hurdles to the implementation to a system like this are the requirement for a microcontroller providing this type of virtualization on the one hand and the complexity of correctly employing this virtualization on the other hand. Virtualization systems such as TrustZone are still orders of magnitude more complex to correctly configure than it is to simply use separate hardware and secure the interfaces in between. \chapter{Alternative uses of grid frequency modulation} % FIXME random beacons? funky consensus protocols? proof of knowledge/cryptographic notary service? \chapter{Conclusion} %FIXME \newpage %\nocite{*} TODO: check unused references \printbibliography[heading=bibintoc] \newpage \appendix \chapter{Transcripts of Jupyter notebooks used in this thesis} \includenotebook{Grid frequency estimation}{grid_freq_estimation} \includenotebook{Grid frequency estimation validation against ROCOF test suite}{freq_meas_validation_rocof_testsuite} \includenotebook{Frequency sensor clock stability analysis}{gps_clock_jitter_analysis} \includenotebook{DSSS modulation experiments}{dsss_experiments-ber} \chapter{Frequency sensor schematics} \fancyhead[C]{Frequency sensor schematics (1/3)} \fancyfoot[C]{} \fancyhead[R]{\thepage} \includepdf[fitpaper,landscape,pagecommand={\thispagestyle{fancy}}]{resources/platform-export-pg1.pdf} \fancyhead[C]{Frequency sensor schematics (2/3)} \includepdf[fitpaper,pagecommand={\thispagestyle{fancy}}]{resources/platform-export-pg2.pdf} \fancyhead[C]{Frequency sensor schematics (3/3)} \includepdf[fitpaper,landscape,pagecommand={\thispagestyle{fancy}}]{resources/platform-export-pg3.pdf} \fancyfoot[C]{\thepage} \chapter{Firmware source code excerpts} \section{DMA-backed ADC capture (adc.c)} \inputminted[fontsize=\footnotesize,linenos,firstline=18,lastline=115,breaklines]{C}{../gm_platform/fw/adc.c} \section{Frequency sensor packetized serial interface} \subsection{serial.c} \inputminted[fontsize=\footnotesize,linenos,breaklines]{C}{../gm_platform/fw/serial.c} \subsection{packet\_interface.c} \inputminted[fontsize=\footnotesize,linenos,breaklines]{C}{../gm_platform/fw/packet_interface.c} \subsection{cobs.c} \inputminted[fontsize=\footnotesize,linenos,breaklines]{C}{../gm_platform/fw/cobs.c} \subsection{Host data logging utility (tw\_test.py)} \inputminted[fontsize=\footnotesize,linenos,breaklines]{python}{../gm_platform/fw/tw_test.py} \section{Frequency estimation (freq\_meas.c)} \inputminted[fontsize=\footnotesize,linenos,breaklines]{C}{../controller/fw/src/freq_meas.c} \section{DSSS demodulation (dsss\_demod.c)} \inputminted[fontsize=\footnotesize,linenos,breaklines]{C}{../controller/fw/src/dsss_demod.c} \section{Cryptographic protocol handling} \subsection{protocol.c} \inputminted[fontsize=\footnotesize,linenos,breaklines]{C}{../controller/fw/src/protocol.c} \subsection{crypto.c} \inputminted[fontsize=\footnotesize,linenos,breaklines]{C}{../controller/fw/src/crypto.c} \chapter{Demonstrator firmware symbol size map} \label{symbol_size_chart} \includepdf[fitpaper]{resources/safetyreset-symbol-sizes.pdf} % FIXME %\chapter{Economic viability of countermeasures} %\section{Attack cost} %\section{Countermeasure cost} %\section{Conclusion} % FIXME maybe include a standard for the technical side of a safety reset system here, e.g. in the style of an IETF draft? \end{document}